Similar Projects
Walker Pond Mill Pond Fish Passage Project
New Construction
Post-Bid
Brooksville, ME 04617

Fish Passage Improvements at the Parker Pond Outlet Dam
New Construction
Post-Bid
Brooksville, ME

Upper Pond Dam Improvements
Results
Skowhegan, ME

PNSG Seawall Replacement
Renovation
Results
$135,286 est. value
Scarborough, ME

Robinson Dam Rehabilitation
Post-Bid
Blaine, ME

Walton's Mill Dam Removal and Park Redevelopment
New Construction, Demolition
Post-Bid
Farmington, ME

Fish Passage Improvements at Crooked Brook Flowage Dam
New Construction
Post-Bid
Danforth, ME

Last Updated 08/25/2021 09:22 AM
Project Title

Stroudwater River Dam Slide Gate Replacement Project

Physical Address View project details and contacts
City, State (County) Portland, ME   (Cumberland County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $70,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Stroudwater River Dam Slide Gate Replacement Project is located on the Stroudwater River immediately west of Westbrook Street bridge over the river 820 feet from intersection of Westbrook Street with Congress Avenue and 160 feet north of the intersection of Garrison Street with Westbrook Street. The dam is located on property held by the city of Portland. Access from Westbrook Street ion the north side of the river. Outline of Work: The work includes the sealing off water from sluice channel and maintaining flow over spillway, removing existing Whipps Aluminum Slide Gate, hauling new slide gate from 109 District Road Facility to the site and installing new Whipps Aluminum Slide Gate (supplied by the city) into existing steel channel track. The existing electric gate operator shall be removed and new operator installed. The Electrical work shall be included in this project. Work also includes but not limited to dewatering, vehicular traffic control, silt fence, SESC tracking pad, restoration of all surfaces and associated work.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents