Project Title | Group 6A Piping Project |
Physical Address | View project details and contacts |
City, State (County) | Tumalo, OR 97703 (Deschutes County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 [brand] Estimate |
Plans Available from | Consultant |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | PROPOSAL: Tumalo Irrigation District, Group 6A Piping Project The work contemplated consists of, but is not limited to the following major items as further defined in the Proposal Documents: o Furnishing, welding, installation and testing of approximately 12,510 LF of 48" Solid-Wall Pipe, welded side-saddle turnouts and delivery assemblies ranging from 1" to 20" in diameter, o Furnishing and installing a pressure reducing assembly, o Associated mobilization, selective demolition, tree removal, trenching, earthwork, backfill, compaction, surface restoration, other restoration, o Coordination of utility locate, utility relocations as necessary, coordination with Owner and Owner's Engineer, and furnishing and installing all other associated meter assemblies, stub turnouts, air and vacuum valve assemblies, valves and valve cans, and appurtenances necessary to provide a complete project, ready for irrigation delivery. All pipe and materials for the project will be supplied by the Contractor. Substantial completion of all work included in the contract agreement must be attained by March 31, 2023. Liquidated damages of $2,000.00 per day for the first 10 days and $10,000.00 per day thereafter shall be assessed should the contractor fail to achieve substantial completion within the time allowed. Ditch rider road restoration, demobilization from the site and all closeout and punch-list items are to be completed by April 30, 2023. For information regarding the proposed work, contact Kevin Crew, P.E. at Black Rock Consulting, Inc., phone 541-480- 6257, e-mail: blackrockci@gmail.com The Owner reserves the right to waive any informality or to reject any or all Proposals not conforming to the intent and purpose of the contract documents or when in the public interest. Any Proposer may withdraw its Proposal prior to the time of Proposal opening and no Proposer may withdraw its Proposal after the time of Proposal opening. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |