Similar Projects
Repair Roofs at Camp Shelby Act of Nature
Bidding
Camp Shelby, Jackson, MS

Repair Roofs at Camp Shelby Act of Nature
Bidding
Camp Shelby, Jackson, MS

Pascagoula-Gautier School District 2021 Roofing Improvements
Renovation
Post-Bid
Pascagoula, MS 39567

Roof Replacement Project - Hurricane Zeta Repairs - Multi-Site
Renovation
Post-Bid
Biloxi, MS 39530

Pemberton HQ`s Porch and Roof Rehab
Bidding
$400,000 to $600,000 est. value
Vicksburg, MS

Roof Repair at Lauderdale County Jail
Post-Bid
Meridian, MS 39301

New Roof Covering Grace Christian and Rowan Elementary Schools
Bidding
Hattiesburg, MS

Roof Replacement for Whitten Middle School
Post-Bid
Jackson, MS

Lloyd Ricks Re-roof West Wing
Bidding
Mississippi State, MS

Covington County Courthouse Re-Roof
Post-Bid
Collins, MS 39428

MGCCC Phase 2 – College Wide Roofing Repair and Replacement
Bidding
Perkinston, MS 39573

2020 Roofing Program
Post-Bid
Laurel, MS 39440

Repair and Re-Roof of Justice Court Building
Bidding
Columbia, MS 39429

East Central Middle School Gym Roof
Post-Bid
$50,000 est. value
Moss Point, MS 39562

Repair and Re-Roof of the Marion County School District Administration Building
Bidding
Columbia, MS 39429

Last Updated 04/23/2021 10:07 AM
Project Title

Civil Defense Building Re-Roof Project

Physical Address View project details and contacts
City, State (County) Columbia, MS 39429   (Marion County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of: Remove existing roofing to the existing concrete deck and properly dispose. Install new 1/8" tapered polyiso insulating sloping from the front of the building to the rear of the building. Install new 1/4" hard coverboard Install new hot asphalt applied 2 ply modified bitumen roofing system with fire-retardant granular white capsheet. Install additional treated wood nailers as required and new prefinished 24 gage edge mental all around. Re-flash all existing roof penetrations, including disconnecting/reconnecting HVAC as required. Provide contractor 2 year warranty and roofing manufacturer's twenty (20) year NDL roof warranty.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents