Similar Projects
Construction of Detention Basin Phase 1 Facilities for Westhaven Manor
Infrastructure
Bidding
TX

Construction of Water, Sanitary, Drainage and Paving Facilities in Balmoral East Section 1
Infrastructure
Bidding
TX

Construction of Water, Sanitary, and Drainage Facilities for Winward Section 4
Post-Bid
TX

South Main Street Drainage Improvements from West Texas Avenue to West Gulf Avenue
Post-Bid
Baytown, TX 77520

ROC Tie Upgrade/Redline Tie Replacement, Drainage, Subgrade Improvements
Results
Less than $12,011,838 est. value
Houston, TX 77054

White Oak Bayou Harvey Repairs in Harris County, Texas
Results
$1,000,000 to $5,000,000 est. value
Houston, TX 77022

Water Distribution, Sanitary Sewer and Drainage Facilities to Serve Champions Oak Section 2
Infrastructure
Bidding
TX

Wafer Street Paving and Drainage Improvements Phase II Project
Post-Bid
Pasadena, TX

Port Road Expansion and Drainage at Bayport Container Terminal
Results
Less than $18,894,468 est. value
Seabrook, TX 77586

Plans for Construction of Paving, Sewer and Drainage Improvements Along Lakeview Haven Drive to Serve
Post-Bid
TX

Barker Watershed Sediment Removal Program (Package 1)
Results
Less than $5,089,579 est. value
Houston, TX 77092

Madison Avenue Paving and Drainage Improvements
Post-Bid
Pasadena, TX 77502

Water Sanitary Sewer and Drainage Facilities to Serve Newport Section 7 Partial Replat Number 5
Results
TX

Kansas Street Paving and Drainage Improvements
Post-Bid
Pasadena, TX 77506

Cypress Point Lake Estates Detention Pond Rehabilitation
Results
Cypress, TX 77429

Last Updated 10/20/2021 11:13 AM
Project Title

Construction of the Water, Sanitary Sewer, and Drainage Facilities to Serve Preserve at Newport Section 1

Physical Address View project details and contacts
City, State (County) TX   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents