Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Yorkfield Detention Basin Wall Detention Basin Wall Repairs - City of Elmhurst
Infrastructure
Conception
$250,000 est. value
Elmhurst, IL

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Design
$4,000,000 CJ est. value
Dixon, IL 61021

RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Design
Schaumburg, IL 60194

Tollway 4831 (Flagg Creek - Hinsdale Oasis)
Infrastructure
Bidding
$2,000,000 CJ est. value
Hinsdale, IL 60521

Repair/Resurface Roadways
Infrastructure
Bidding
$598,855 CJ est. value
Warrenville, IL 60555

Earthwork
Post-Bid
Glendale Heights, IL 60139

Fire Hydrant Maintenance and Flow Testing
Post-Bid
Downers Grove, IL

RR-20-4544 - M-8 Maintenance Facility Westbound Access Road
Renovation
Results
Oak Brook, IL 60521

Co-Op Park Site Improvements
Results
Glen Ellyn, IL 60137

Lexington Trace Parcel Unit 2 Townhomes
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Naperville, IL 60563

Lexington Trace Parcel Unit 2 Townhomes
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Naperville, IL 60563

Public Work Phase III and Other Improvements - City of Elmhurst
Renovation, Alteration
Conception
$2,475,000 est. value
Elmhurst, IL 60126

Blanchard Circle Mixed Use Buildings
New Construction, Infrastructure - 16,400 SF
Design
$4,000,000 CJ est. value
Wheaton, IL 60189

Rehabilitation of the 2,000,000 Gallon Legged High Tank
Renovation, Infrastructure
Bidding
$400,000 CJ est. value
Downers Grove, IL 60515

Last Updated 08/18/2022 03:13 PM
Project Title

Cured in Place Pipe (CIPP)

Physical Address View project details and contacts
City, State (County) Addison, IL 60101   (DuPage County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $43,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

It is the intent of this specification to provide for the cleaning, root cutting (as necessary), and reconstruction of approximately 780 lineal feet by the installation of cured-in-place pipe (CIPP). CIPP is formed by the insertion of a resin-impregnated flexible felt tube into the existing pipe. The tube is expanded in an inversion process to fit against the original conduit, and then heated to cure the resin. The finished product shall be a joint- less, structural pipe that is formed to the existing pipe. All materials, labor, and equipment shall be provided by the successful bidder, through this not-to-exceed bid price, to provide a complete turn-key project. Completion of project will be by Nov.1st, 2022. At the precise time set for bid opening, bids will legally be made public. Bidders or their representatives are encouraged to attend the bid opening. Prevailing Wages: The work of this Project is subject to the Illinois Prevailing Wage Act, 820 ILCS 130/0.01 et seq. A prevailing wage determination has been made by the Illinois Department of Labor for public works projects in DuPage County. The Contract entered into for the work will be drawn in compliance with said law and proposals should be prepared accordingly and provide for payment of all laborers, workmen, and mechanics needed to perform the work at no less than the prevailing rate of wages (or the prevailing rate for legal holiday and overtime work) for each craft, type of worker, or mechanic. For purchases of materials, goods or equipment, the materials, goods or equipment purchased must be delivered within thirty calendar (30) days from the date of execution of the Contract unless a specific delivery date is stated on the bid. Contract may be cancelled without obligation by the Village if delivery requirements are not met. If said Contract is not cancelled by the Village, liquidated damages may be due and owing to the Village pursuant to the liquidated damage provision enumerated herein. All deliveries must be made on Monday through Friday, excluding Village holidays, between the hours of 8:00 am and 4:00 pm. Contractor is expected to ship in full truckload quantities within said thirty (30) day period unless prior approval has been granted by the Village in advance for circumstances beyond the control of the Contractor. The Village reserves the right to (i) reject all bids; (ii) reject only certain bids which are non-conforming or non-responsive to the bid requirements; (iii) accept only a portion, part or specific items of work of all and reject others, as the Village shall in its sole discretion determine to be in its best interest; and/or (iv) award the Contract to the responsible bidder submitting the lowest bid responsive to the bidding requirements. No bid will be accepted from or Contract awarded to any person, firm or corporation that is in arrears or is in default to the Village upon any debt or contract, or that is a defaulter, as surety or otherwise, upon any obligation to said Village or that has failed to perform faithfully any previous contract with the Village. A. 746 Comstock Ave. to 100 Comstock Ave. (157 ft.) B. 100 Comstock Ave. to 108 Comstock Ave. (79 ft.) C. 108 Comstock Ave. to 114 Comstock Ave. (71 ft.) D. 114 Comstock Ave. to 136 Comstock Ave. (252 ft.) E. 136 Comstock Ave. to 725 S. Harvard Ave. (219 ft.)

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents