Similar Projects
Henderson Park Restroom Additions
Bidding
Tucker, GA 30084

Design-Build the Future Westside Park at Bellwood Quarry
New Construction - 1,076 SF
Sub-Bidding
Atlanta, GA

CM at Risk Services Town Center on Main Park
New Construction
Post-Bid
$11,000,000 to $13,000,000 est. value
Suwanee, GA 30024

Restroom Partition Replacement
Post-Bid
GA

Ocee Park Restroom Construction-Site Work and Sewer
Results
Johns Creek, GA

Claude Grey Park Pavilion and Restrooms
Results
Locust Grove, GA

Restroom Buildings Construction Contracts A and B
Construction
Cleveland, GA

Fountain Restroom Construction
Post-Bid
Forest Park, GA

Fannin Recreation Remodel
Results
Blue Ridge, GA

Main Street Park Restroom/Concession Building
New Construction - 1,682 SF
Post-Bid
Dawsonville, GA 30534

Spalding County Parks Restrooms Additions
Addition
Results
GA

Hill Park Restrooms Project
Post-Bid
Madison, GA

Lilburn City Park Restrooms
Results
Less than $777,189 est. value
Lilburn, GA

Restroom Partitions for Brooks Park
Post-Bid
Brooks, GA 30205

Renovation of Rest Room at Newtown Park
Renovation
Results
Johns Creek, GA 30022

Last Updated 12/05/2018 07:41 PM
Project Title

Restroom Renovation for Ocee Park

Physical Address View project details and contacts
City, State (County) Johns Creek, GA 30022   (Fulton County)
Category(s) Entertainment/Recreation
Sub-Category(s) Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Furnish and install all necessary materials, labor, tools, and supplies to complete Restroom Renovation Projects. 1. Project to include all materials, tools, supplies, storage, freight, design, and labor for the work to be completed. 2. Remove old counter tops, sinks, faucets and associated fixtures. 3. Remove existing toilets, urinals, lavatories, and associated fixtures and accessories and reinstall. 4. Remove existing laminate partitions and hardware. 5. Remove existing wall, base, and floor tile. 6. The floor tile shall be replaced with new premium quality commercial tile. 7. Install new tile backer board and new wall and base tile five feet up from the floor. Caulk all finish areas with premium quality minimum 15 year caulk. 8. Install new counter tops, new under mount porcelain sinks, and new permanent powered commercial grade sensor faucets and soaps dispensers. 9. Replace the existing toilets and urinals. Supply new, hardwired commercial grade sensor flush valves for each. New toilet seats to be included for all toilets. 10. Install new solid partitions that are the same style and configuration as the existing. The Parks Manager shall select the color and finish. New hardware to be furnished. 11. Retrofit all fluorescent lighting fixtures to comparable LED lighting. 12. New LED wall fixtures to be supplied and installed. 13. New sensor lighting switches to be furnished and installed. 14. New sensor electric hand dryers to be supplied and installed for each restroom. 15. Paint all walls, ceilings, doors, and trim of the Men's and Women's restrooms. 16. New baby changing tables to be installed, including wall repairs, in all restrooms. 17. All carpentry, plumbing, electrical, painting, tile, and associated work necessary will be included in this project. Additional electrical circuits may be required: 1. Disposal of the old materials to be included. City to retain fixtures as needed. 2. Job site to be kept clean and restrooms to be professionally cleaned at the end of each work day 3. Supply new signage for each restrooms 4. Provide a full 12 month warranty on materials, labor, and workmanship.
Details
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents