Similar Projects
Dry Run Area Sewers Phase 2 Contract Round Bottom Road - Metropolitan Sewer District of Greater Cincinnati
New Construction, Infrastructure
Design
$5,184,500 CJ est. value
Milford, OH 45150

Dry Run Area Sewers Phase 2 Contract Round Bottom Road - Metropolitan Sewer District of Greater Cincinnati
New Construction, Infrastructure
Design
$5,184,500 CJ est. value
Milford, OH 45150

SR 32 - Interchange
Infrastructure
Bidding
$26,929,540 CJ est. value
Batavia, OH 45103

SR 32 - Interchange
Infrastructure
Bidding
$26,929,540 CJ est. value
Batavia, OH 45103

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Two Lane Resurfacing - CLE-US 50/SR 131-02.21/08.51
Infrastructure
Results
$1,402,692 est. value
Batavia, Milford, OH 45150

District Asphalt Projects
Infrastructure
Results
$444,470 est. value
Cincinnati, OH

St Columban Community Center
Addition, Infrastructure - 15,373 SF
Construction
$4,000,000 CJ est. value
Loveland, OH 45140

RFP Engineering - Water Main Replacement 2023 Project Bundle 4
Infrastructure
Pending Verification
$400,000 CJ est. value
Cincinnati, OH 45202

RFP Engineering - Water Main Replacement 2023 Project Bundle 4
Infrastructure
Pending Verification
$400,000 CJ est. value
Cincinnati, OH 45202

SR 132/SR 749 Preventive Maintenance
Infrastructure
Design
$2,354,670 CJ est. value
Batavia, OH 45103

Culvert Replacement
Infrastructure
Bidding
$439,873 CJ est. value
Batavia, OH 45103

Goshen Township Road 74 Resurfacing Project
Infrastructure
Post-Bid
Goshen, OH

Mcpicken Road and Menno Drive Water Main Replacement
Infrastructure
Results
$834,928 est. value
Batavia, OH 45103

Last Updated 08/22/2023 03:07 AM
Project Title

Branch Hill Guinea Road Sewer Extension

Physical Address View project details and contacts
City, State (County) Batavia, OH 45103   (Clermont County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $388,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Work under this project is generally defined as the construction of approximately 582 feet of 8" gravity sewer and appurtenances along Branch Hill Guinea Road, starting at the intersection of Harper Lane and continuing north to Wards Corner Road, located in Miami Township. The Owner expects to proceed with the construction under the Project immediately after satisfactory acceptance and award of the construction bid and execution of the contract, with completion of all work for within 150 calendar days from the date of the Notice to Proceed. The Board of County Commissioners, Clermont County, Ohio, reserves the right to reject any and all bids, to waive any informalities in the bidding procedure, to accept any bid which it deems to be for the best interest of the County and to hold such bids for a period of sixty (60) days before taking action to award a contract. These rights are reserved up until the time the contract is signed by the Board of County Commissioners. Each Bidder must submit their bid in Triplicate, one (1) original and two (2) copies with each copy stamped "Copy". Each bidder must deposit with his bid, security in the amount of 100% of the bid if in the form of a Bid Bond or in the amount of not less than ten (10%) percent of the bid if in the form of a certified check, cashier's check or letter of credit, for and subject to the conditions provided in the Information for Bidders and pursuant with Ohio Revised Code Section 153.54.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents