Similar Projects
Beach Erosion Control and Hurricane Protection Project Bal Harbour Beach Renourishment 2020 Miami-Dade County, Florida
Bidding
$10,000,000 to $20,000,000 est. value
Miami, FL

CDBG Drainage Improvements and Water Main Installation
Bidding
$1,971,586 est. value
FL

Canal Maintenance Services
Term Contract
Post-Bid
Miami, FL 33128

Sweetwater Drainage Improvements: Phase 8A
Post-Bid
Sweetwater, FL 33174

SE Florida Sediment Morphodynamics
Results
Everglades, Lake Worth, Miami, Palm Beach, FL 32207

Drainage Improvements Multiple Sites
Results
Less than $366,769 est. value
FL

South Miami-Dade Salt Intrusion Barrier Project
Post-Bid
Less than $500,000 est. value
Miami, FL 33128

Canal Bank Stabilization Program: Year 7
Results
Less than $2,250,000 est. value
Doral, FL 33166

Madeleine Village Apartments Seawall Replacement
Post-Bid
Less than $530,000 est. value
Miami Beach, FL 33139

Drainage Improvements Multiple Sites
Results
Less than $549,382 est. value
Miami, FL 33128

Design and Construction of Concrete Hurricane-Resistant Screen Wall at Miami Job Corps Center
Post-Bid
$250,000 to $500,000 est. value
Miami Beach, FL 33056

Rickenbacker Causeway Drainage Improvement
Results
Less than $75,000 est. value
Miami, FL 33128

Florida City Canal Outfall and Equalizer Improvements Project
Post-Bid
Less than $989,000 est. value
Miami, FL 33128

Drainage Improvements Multiple Sites
Results
Less than $335,886 est. value
Miami, FL 33134

Arcola Lakes - Bioretention Area
Post-Bid
Less than $98,000 est. value
Miami, FL 33147

Reported 11/05/2020 12:00 AM
Project Title

Drainage Improvements Gladeview Area Phase I-A and Phase II

Physical Address View project details and contacts
City, State (County) Miami, FL 33128   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,140,058
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes but is not limited to the construction and installation of drainage structures, French drains, miscellaneous drainage improvements, grading, sodding, and miscellaneous roadway restoration including construction of concrete curb and gutters, and sidewalks A. The location of work to be performed under the terms of this Contract shall be as follows: 1. Phase I-A: NW 12 Ave. to NW 17 Ave. from NW 75 St. to NW 79 St., and NW 75 St. from NW 14 Ave. to NW 15 Ave. 2. Phase II: NW 73 St to NW 74 Terr. from NW 18 Ave. to NW 19 Ave., and NW 75 St. from NW 17 Ave to NW 18 Ave.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents