Similar Projects
Jail Expansion and Modernization
Renovation
Conception
Midland, TX

Juvenile Detention Center
New Construction
Conception
Midland, TX 79701

Carrollton Detention Center Upgrades
Renovation
Design
Carrollton, TX 75006

Tarrant County Juvenile Center Project
Post-Bid
Fort Worth, TX 76111

Administration House Leveling-Pier and Beam Wood House Leveling
Renovation
Post-Bid
$25,000 to $100,000 est. value
Bryan, TX 77803

Repair Structural Damage
Results
$1,000,000 to $5,000,000 est. value
Houston, TX 77002

Detention Center Infrastructure Upgrade Project for Harris County
Results
Houston, TX 77002

CoreCivic Ice Upgrades
Renovation - 14,000 SF
Construction
Eden, TX 76837

Peden Building Renovation
Renovation
Pending Verification
$9,124,376 est. value
Houston, TX 77002

Juvenile Justice Center
Renovation, Addition
Conception
Midland, TX 79705

Jail Administration Office Renovations
Renovation
Post-Bid
Madisonville, TX 77864

Shower Renovation in Fort Bend County Jail
Renovation
Results
Less than $958,000 est. value
Richmond, TX 77469

Furniture Sheriff's Office/Jail Expansion
Post-Bid
TX

Construction of the West Detention Facilities Phase 2 to Serve Magnolia Ridge Forest
Results
TX

Construction Manager at Risk for the Expansion/Renovation of the Bell County Loop Jail
Addition
Post-Bid
$90,000,000 to $100,000,000 est. value
TX

Last Updated 09/27/2021 11:47 AM
Project Title

Adult Detention Facilities Upgrades and Repairs

Physical Address View project details and contacts
City, State (County) Houston, TX 77002   (Harris County)
Category(s) Government/Public
Sub-Category(s) Prison/Jail
Contracting Method Competitive Bids.
Project Status Obtained from a credible source, Awaiting verification
Bids Due View project details and contacts
Estimated Value $185,541,609
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The various projects will address critical upgrades and repairs to keep the County's Adult Detention Facility operational. The Office of the County Engineer has been working with members of Harris County Sheriffs Office and an outside engineering firm to develop a five year repair and renovation program for both the 580,400 square foot jail located at 701 San Jacinto, and the 790,921 square foot jail located at 1200 Baker Street. These facilities opened in 1990 and 2002 respectively and have had minimal infrastructure repairs since opening. Upgrades will be made to the HVAC systems, replacement of roofs, modernization of elevators and sprinklers, as well as the replacement of both the domestic water and sanitary sewer systems. Additionally, all electronic security systems will be upgraded and the kitchens will be renovated. Project timing must allow for phasing across multiple years due to active occupancy throughout the facilities. Year One funding is focused on replacing a generator, replacement of the sanitary sewer piping, and replacing detention doors throughout the 701 San Jacinto facility.

Details

1,371,321 SF - Prison/Jail, 580,400 SF Renovation, Prison/Jail, 790,921 SF Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents