Similar Projects
Barker Cypress Road Waterline Loop
Post-Bid
Houston, TX

Imperial Forest Section 5
Post-Bid
Houston, TX

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water, Sanitary and Drainage Facilities in Harper`s Preserve Sections 20-A & 20-C
Infrastructure
Post-Bid
Conroe, TX 77303

Elgin FM 1704 Wastewater Extension
Results
$2,000,000 est. value
Elgin, TX 78621

Sanitary Sewer Force Main Project
Infrastructure
Post-Bid
Junction, TX

20" Waterline Relocation for the Eleanor Street FMA Grant Project
Results
Less than $127,746 est. value
Beaumont, TX 77720

Upland Waterline Relocation
Infrastructure
Post-Bid
$180,000 est. value
Lubbock, TX 79405

Water Line Replacement along Jones Road, Balcrest Drive, Dunbrook Drive and Creektree Drive
Results
Less than $1,387,331 est. value
Houston, TX 77070

2021 Annual Water Distribution Leak Repairs, Package 4 Project
Term Contract
Results
Less than $1,605,302 est. value
San Antonio, TX 78200

Water, Sewer and Drainage to Serve Breckenridge West, Section 11
Results
Houston, TX 77019

Construction of Water Sanitary Drainage and Paving Facilities in Ladera Creek Trace Street Dedication Phase 2
Results
$459,100 est. value
TX

Proposed 84" Water Line Along Center Point Energy Northbelt Corridor
Results
$25,000,000 to $28,000,000 est. value
Houston, TX 77068

Jack Road Street Dedication and Reserve
Results
Less than $2,482,015 est. value
Hockley, TX 77447

Reported 01/13/2022 12:00 AM
Project Title

2017-2018 Capital Improvements - Phase-1 - Hinds-Wildcat Water System

Physical Address View project details and contacts
City, State (County) Wichita Falls, TX   (Archer County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The major items to be furnished and installed are: High Service Pump Station (including building, ground storage tank, pressure tank, etc.) 8” PVC Transmission Line (approx. 20,800), Boring & Casing for 8” Carrier Pipe (approx. 475 LF), Boring (No Casing) & 8” HDPE Carrier Pipe (approx. 830 LF), 6” PVC Distribution Line (approx. 13,600 LF), Boring & Casing for 6” Carrier Pipe (approx. 40 LF), Casing (Open-Cut) for 6” Carrier Pipe (approx. 120 LF), Boring (No Casing) & 6” PVC Carrier Pipe (approx. 450 LF), Gate Valves, Manual Air Release Valves, Flushing Valves, Metering/Control Facilities, and other miscellaneous work.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents