Last Updated | 02/22/2022 08:03 AM |
Project Title | FY21-22 Baltimore Harbor and Channels Maintenance Dredging |
Physical Address | View project details and contacts |
City, State (County) | Baltimore, MD 21202 (Anne Arundel County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dredging |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $10,000,000 to $25,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of maintenance dredging approximately 1,500,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between November 2021 through March 2022. The dredging depth is planned for 51 feet mean lower low water (MLLW) with an additional 1 to 2 feet of allowable overdepth for three channel reaches including: Fort McHenry, Craighill Entrance, and Cutoff Angle Channels. The channels vary in width from 700 to 1,740 feet. The material dredged from the Fort McHenry Channel (approx. 525,000 cy) will be placed in the Masonville Dredged Material Containment Facility. The material dredged from the Craighill Entrance and Cutoff Angle channels (totaling approx. 945,000 cy) will be placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. The work will include an optional item for dragging of an approximate 2,000,000 square foot area of the Northwest Branch East Channel, which is authorized to a depth of 49 feet MLLW. A large portion of the work may be performed during the winter months when weather conditions are most severe and will be accomplished in a heavy commercial waterway supporting the Port of Baltimore. The equipment required for this work commonly consists of two 30 plus cubic yard clamshell dredges, one 24-30 inch hydraulic unloader, six to eight large tugs, six to eight 2,500 – 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline. The material will be dredged by clamshell/bucket and scow and placed within an anticipated period of performance of approximately 100 calendar days from receipt of Notice-to-Proceed. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |