Similar Projects
Fishing Creek South Jetty Rehab and Maintenance Dredging, Calvert County, Maryland
Post-Bid
$1,000,000 to $5,000,000 est. value
Chesapeake Beach, MD

Bird River Channel Improvements
Alteration
Results
$1,000,001 to $2,500,000 est. value
Towson, MD

Jack Creek Park Dredging Material Beneficial Use
Infrastructure
Bidding
$250,000 to $500,000 est. value
Shady Side, MD 20764

Fy21 Maintenance Dredge, Baltimore Harbor and Channels
Design
$10,000,000 to $25,000,000 est. value
Baltimore, MD

Sewell`s Orchard Pond Retrofit
Infrastructure
Bidding
$100,000 to $500,000 est. value
Columbia, MD 21046

Structural Maintenance and Dredging Services for the Inner Harbor
Infrastructure
Post-Bid
Baltimore, MD

Hurst Creek Resiliency and Dredging Project
Infrastructure
Post-Bid
MD

Maintenance Dredging of Cape Henry Channel (VA), Baltimore Harbor and Channels
Term Contract
Post-Bid
Less than $20,000,000 est. value
Baltimore, MD 21202

Maintenance Dredging of Cape Henry Channel (VA), Baltimore Harbor and Channels
Design
$10,000,000 to $25,000,000 est. value
Baltimore, MD

Franklin Manor Dredging
Results
$250,000 to $500,000 est. value
Annapolis, MD

Yacht Basin Dredging Project
Infrastructure
Results
Havre de Grace, MD

Brighton Dam Dredging Project
Infrastructure
Results
$1,508,000 est. value
Laurel, MD

Deep Creek Headwaters and Cove Dredging
Infrastructure
Results
$250,000 to $500,000 est. value
Annapolis, MD

Lower Wicomico River Maintenance Dredging, Wicomico County, Maryland
Post-Bid
$1,000,000 to $5,000,000 est. value
MD

Last Updated 02/22/2022 08:03 AM
Project Title

FY21-22 Baltimore Harbor and Channels Maintenance Dredging

Physical Address View project details and contacts
City, State (County) Baltimore, MD 21202   (Anne Arundel County)
Category(s) Heavy and Highway
Sub-Category(s) Dredging
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of maintenance dredging approximately 1,500,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between November 2021 through March 2022. The dredging depth is planned for 51 feet mean lower low water (MLLW) with an additional 1 to 2 feet of allowable overdepth for three channel reaches including: Fort McHenry, Craighill Entrance, and Cutoff Angle Channels. The channels vary in width from 700 to 1,740 feet. The material dredged from the Fort McHenry Channel (approx. 525,000 cy) will be placed in the Masonville Dredged Material Containment Facility. The material dredged from the Craighill Entrance and Cutoff Angle channels (totaling approx. 945,000 cy) will be placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. The work will include an optional item for dragging of an approximate 2,000,000 square foot area of the Northwest Branch East Channel, which is authorized to a depth of 49 feet MLLW. A large portion of the work may be performed during the winter months when weather conditions are most severe and will be accomplished in a heavy commercial waterway supporting the Port of Baltimore. The equipment required for this work commonly consists of two 30 plus cubic yard clamshell dredges, one 24-30 inch hydraulic unloader, six to eight large tugs, six to eight 2,500 – 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline. The material will be dredged by clamshell/bucket and scow and placed within an anticipated period of performance of approximately 100 calendar days from receipt of Notice-to-Proceed.

Details

Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents