Similar Projects
Sunrise of Summit
New Construction, Demolition
Construction
Summit, NJ 07901

Spray Booth Improvements - Fernwood Building 26
Results
Less than $193,800 est. value
Ewing, NJ

Market Street Bus Garage Rehabilitation Project
Addition - 3,232 SF
Results
Paterson, NJ

Construction Management Services for the Market Street Bus Garage Rehabilitation Project
Results
Newark, NJ 07105

Development,Operations and Maintenance of Cargo and Other Aeronautical Facilities
Post-Bid
Jersey City, NJ 07302

Design Build Services for a Car Port PV System for the Picatinny Arsenal Building. 3801
Post-Bid
$1,000,000 to $1,500,000 est. value
Picatinny Arsenal, NJ 08706

Purchase and Installation of 150 Bus Shelters
Results
Newark, NJ

Smart Bus Shelters
New Construction
Post-Bid
Guttenberg, NJ

Furnish and Deliver Parking Booths
Results
Somerville, NJ 08807

Toll Vault Lid Repair Services
Results
Neptune, NJ 07095

Romaine Avenue Multifamily
New Construction - 2,047 SF
Design
Jersey City, NJ

TPK Deck Reconstruction, MP E113.0 to E115
Renovation
Bidding
NJ

Last Updated 06/30/2021 12:08 PM
Project Title

PPA & New Solar Canopies at Robbinsville High School, Pond Road Middle School and Sharon Elementary School

Physical Address View project details and contacts
City, State (County) NJ 08691   (Mercer County)
Category(s) Transportation
Sub-Category(s) Misc. Structures
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of new solar photovoltaic arrays on new self-supporting parking lot canopies over various existing parking lots at three schools. Single Overall Contract (C035 with C009, C029, C047); It is the intent of this project to furnish, install and operate a photovoltaic system of specified minimum output at the following individual school buildings utilizing a Power Purchase Agreement (PPA), subject to all laws, regulations and guidelines pertaining to same: Robbinsville High School 1,550.4 kW Pond Road Middle School 765 kW Sharon Elementary School 771.375 kW For a total system size of not less than 3,086.775 kW. The system will be constructed on the ground and within the existing parking lot limits indicated on the drawings.

Details

Misc. Structures, New Construction.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Solar Energy Heating Equipment, Packaged Solar Heating Equipment, Solar Air-Heating Panels.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents