Similar Projects
Last Updated | 06/30/2021 12:08 PM |
Project Title | PPA & New Solar Canopies at Robbinsville High School, Pond Road Middle School and Sharon Elementary School |
Physical Address | View project details and contacts |
City, State (County) | NJ 08691 (Mercer County) |
Category(s) | Transportation |
Sub-Category(s) | Misc. Structures |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Installation of new solar photovoltaic arrays on new self-supporting parking lot canopies over various existing parking lots at three schools. Single Overall Contract (C035 with C009, C029, C047); It is the intent of this project to furnish, install and operate a photovoltaic system of specified minimum output at the following individual school buildings utilizing a Power Purchase Agreement (PPA), subject to all laws, regulations and guidelines pertaining to same: Robbinsville High School 1,550.4 kW Pond Road Middle School 765 kW Sharon Elementary School 771.375 kW For a total system size of not less than 3,086.775 kW. The system will be constructed on the ground and within the existing parking lot limits indicated on the drawings. |
||||
Details | Misc. Structures, New Construction.
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |