Similar Projects
Water Pollution Control Facility Building Envelope Improvements - Phase 1 - E-7 - Town of Amherst
Renovation
Conception
$3,500,000 CJ est. value
Buffalo, NY 14228

Water Pollution Control Facility Building No. 1 Screen and Gate Rehab - Phase 2 - E-19 - Town of Amherst
Renovation
Conception
$1,100,000 CJ est. value
Buffalo, NY 14228

Big Sister Creek WRRF IT Infrastructure Improvements Project
Renovation
Bidding
$250,000 CJ est. value
Angola, NY 14006

Generator Procurement Sturgeon Point Water Treatment Plant Filtration Piping, Valve, and Underdrain System Improvements Ecwa
Renovation
Post-Bid
$7,500,000 CJ est. value
Derby, NY 14047

Rate of Flow Controllers Procurement Sturgeon Point Water Treatment Plant Filtration Piping, Valve, and Underdrain System Improvements Ecwa
Term Contract
Post-Bid
Derby, NY 14047

Southtowns Incinerator Tray Scrubber Replacement and Crane Installation Project
Renovation
Results
Buffalo, NY 14219

East Aurora WRRF Control Building Improvement Project
Renovation - 1,800 SF
Results
$1,000,000 est. value
East Aurora, NY 14052

Bird Island Treatment Facility Improvement - Buffalo Sewer Authority
Infrastructure
Pending Verification
$2,925,000 CJ est. value
Buffalo, NY 14202

Water Pollution Control Facility Digester Rehabilitation - E-16 - Town of Amherst
Renovation
Conception
$3,000,000 CJ est. value
East Amherst, NY 14051

Southtowns Influent Pump Replacement Contract 72A-General/Mechanical and 72D-Electrical
New Construction, Alteration
Results
$1,000,000 est. value
Buffalo, NY 14219

Water Pollution Control Facility Incinerator Rehabilitation - E-18 - Town of Amherst
Renovation
Conception
$7,200,000 CJ est. value
East Amherst, NY 14051

Lackawanna Water Resource Recovery Facility (WRRF) Digester & Solids Management
Renovation
Results
$500,000 est. value
Lackawanna, NY 14218

Water Pollution Control Facility Roof System Replacements - Phase 3 - Town of Amherst
Renovation
Conception
$750,000 CJ est. value
Buffalo, NY 14228

Unit Substations Procurement Sturgeon Point Water Treatment Plant Filtration Piping, Valve, and Underdrain System Improvements
Renovation
Results
$663,300 CJ est. value
Derby, NY 14047

Sturgeon Point Water Treatment Plant Washwater Tank Replacement
Infrastructure
Results
$3,530,700 CJ est. value
Derby, NY 14047

Last Updated 03/29/2023 03:35 PM
Project Title

Southtowns Advanced Wastewater Treatment Facility Influent Screening Replacement Project - General Construction

Physical Address View project details and contacts
City, State (County) Buffalo, NY 14219   (Erie County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The contract is located in Erie County Sewer District No. 3 (ECSD No. 3) Southtowns Advanced Wastewater Treatment Facility, S-3690 Lakeshore Road, Hamburg, NY 14219. Work includes replacement of three influent screens, three washer-compactors, one belt conveyor, and three sluice gates; supply and installation of three slide gates, six level sensors, FRP grating and ladders; associated new electrical and control systems; and restoration Erie County Sewer District No. 3 is an exempt organization under the Tax Law, and are exempt from payment of Sales and Compensating Use Taxes which are to be incorporated into the project and which are to be separately sold by the Contractors to the Owner prior to incorporation into the project, pursuant to the provisions of the contract. These taxes are not to be included in the bid. Sales tax will be due on all materials purchased by a Contractor which are either "consumable" or rental property used by the Contractor in connection with the construction or repair. Each proposal must be accompanied by a certified check payable to the Erie County Comptroller or by a bid bond having a surety thereon from a surety company acceptable to the County Attorney, in an amount not less than five percent (5%) of the total base bid, as surety for execution of the contract. The successful bidder will be required to furnish Payment and Performance Bond, each in an amount equal to 100 percent of the contract award. Attention of the bidder is called particularly to requirements with respect to conditions of employment to be observed, minimum wages rates to be paid under the contract, Affirmative Action requirements for Equal Employment Opportunity, along with the Minority Business Enterprise Utilization Commitment. Bidders are also advised that Part "A" of the Erie County Minority Business Enterprise/Women's Business Enterprise Utilization Report be submitted with the bid or no later than three (3) business days after the bid opening. The attention of the bidder is called particularly to the provisions of Erie County Local Law No. 3-2018, known as the "Erie County Workforce Development and Diversification New York State Certified Worker Training Program", all bids $250,000 or greater are required to have in place and provide written proof at the time of bid, a New York State Certified Worker Training Program, either intentional to the Contractor or Subcontractor and/or through an organization servicing several Contractors or Subcontractors, appropriate for the type and scope of work to be performed. In the alternative, Rules and Regulations pertaining to Local Law No. 3-2018 allows the Bidder to provide a statement as to the inapplicability, lack of career opportunities, and/or that the magnitude of the contract would make apprentices impractical. Bidders shall also provide affirmation of its commitment toward acceptable achievement or progress toward the County of Erie workforce development and diversification goal of 13.2 percent minority and 6.9 percent female participation combined in project personnel including trades people, trainees, journeymen, apprentices and supervisor staff. The attention of the bidder is called to the requirements of Erie County Executive Order No. 18 for hiring local and disadvantaged workers on Erie County construction projects. All bids $250,000 or greater must include a verified attestation of intent to comply and statement of work force. The attention of the bidder is called to the provisions of Article 5A of the General Municipal Law which requires the bidder to execute a certificate of non-collusion and to conform with the other provisions of Article 5A outlined in the specifications. A form for such certificate accompanies the bid form. Unless it is property executed, the bid will not be accepted. The envelope containing the bid must be sealed, addressed to the Erie County Commissioner of Environment and Planning and must be clearly and correctly designated as "Erie County Sewer District No. 3, Contract No. 73-A General, Southtowns AWTF Influent Screening Replacement Project" or "Erie County Sewer District No. 3, Contract No. 73-D Electrical, Southtowns AWTF Influent Screening Replacement Project". Bidders submitting a bid for more than one contract must do so in separately sealed envelopes for each contract. Any envelope containing more than one bid will be considered an improper bid and not opened. Any bids not delivered in person shall be mailed to the Erie County Commissioner of Environment and Planning, 95 Franklin Street, Room 1034, Buffalo, New York 14202, and received prior to the time set for the bid opening. The attention of the bidder is called to the requirements of Erie County Local Law No. 2 - 2021 the Lowest Responsible Bidder Law, which requires bidders to complete and submit with their bid the New York State Vendor Responsibility Questionnaire and Attachments A, B, and C. A legible, paper copy of these documents must be provided, even if the documents are completed online. The right to reject any and all bids, to waive any informalities in, or to make any award to other than the low bidder, should it be deemed to be in the best interest of Erie County Sewer District No. 3 and in accordance with Law, are herewith reserved. No bidder may withdraw his bid within 45 days after the date set for the opening thereof, but may withdraw same any time prior to the scheduled time for opening bids. CONTRACT 73 The percentage (%) of MBE utilization goals for this contract is 10% The percentage (%) of WBE utilization goals for this contract is 2%.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents