Similar Projects
New Water Treatment Plant
New Construction
Design
Lancaster, OH

BMW FLOC/SED Basins 1 and 2 and Lake Intake Structure Evaluation, Rehabilitation and Painting
New Construction, Alteration
Bidding
$940,000 est. value
Batavia, OH 45103

Permanganate System and Treatment Basin Improvements
New Construction
Bidding
Lima, OH

2019 Water Treatment Plant Improvements
Renovation
Post-Bid
Ironton, OH 45638

Water Treatment Plant Improvements
Post-Bid
Less than $120,000 est. value
Pleasantville, OH 43148

Water Treatment Facilities Filter Effluent Valve Replacement
Results
Less than $49,600 est. value
Ironton, OH 45638

Water Treatment Plant Filter Valving Replacement
Results
Less than $389,000 est. value
Westerville, OH

Choctaw Lake Water Treatment Plant
New Construction - 2,084 SF
Construction
$1,870,000 est. value
London, OH

Village of Commercial Point Water Treatment Plant
Construction
Commercial Point, OH 43116

Water Treatment Plant Filter Media Replacement & Improvements
Alteration
Bidding
$99,996 est. value
Andover, OH 44003

Repair of the Miami Treatment Plant Fall Protection System
Post-Bid
Dayton, OH

WTP Clarifier Renovation
Results
Less than $196,000 est. value
New Concord, OH 43762

2020 Water Treatment Plant
New Construction - 38,800 SF
Construction
$40,570,000 est. value
Marysville, OH

7-12 Water Treatment Improvements
New Construction
Bidding
$497,500 est. value
OH

Water Treatment Plant Expansion
Post-Bid
Xenia, OH 45385

Reported 10/06/2021 11:07 AM
Project Title

Chemical Feed System Improvements

Physical Address View project details and contacts
City, State (County) Fremont, OH   (Sandusky County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value $875,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of work for this project consists of the construction of a new chemic al feed building at the reservoir site to feed PAC and Earthtec at the reservoir.

Details

Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents