Similar Projects
Greenways at Sand Creek
New Construction
Conception
Colorado Springs, CO 80922

Kaleidos
New Construction
Conception
Colorado Springs, CO 80916

Academy Heights Apartments
New Construction - 158,526 SF
Design
Colorado Springs, CO

Academy Heights Apartments
New Construction - 158,526 SF
Design
Colorado Springs, CO

CDBG Accessibility for All - Phase 1 Gazebo Lake Park Improvements
Renovation, Infrastructure
Bidding
Green Mountain Falls, CO 80819

Alta Living Apartments
Renovation
Sub-Bidding
Colorado Springs, CO 80906

Barnes Center Apartments
New Construction - 207,333 SF
Post-Bid
Colorado Springs, CO 80917

Soda Springs Park Improvements
Post-Bid
$275,000 to $330,000 est. value
Manitou Springs, CO 80829

Design-Build Services for Widefield Community Park Phase II Improvements
Results
Colorado Springs, CO 80911

Falcon Regional Park Phase 2
Results
Falcon, CO 80106

Rio Grande Apartments
New Construction - 285,784 SF
Construction
$8,000,000 to $10,000,000 est. value
Colorado Springs, CO 80900

430 West Pikes Peak Apartments
New Construction - 10,500 SF
Construction
$2,000,000 est. value
Colorado Springs, CO 80904

Reagan Ranch
New Construction
Pending Verification
Colorado Springs, CO 80929

Outlook at Briargate
New Construction
Pending Verification
Colorado Springs, CO 80920

East Fountain Apartments
New Construction - 82,500 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Colorado Springs, CO 80916

Last Updated 03/11/2022 03:29 PM
Project Title

Caliber at Briargate

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO   (El Paso County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Park/Playground, Parking Garage
Contracting Method General Contractor to Subcontract.
Project Status Construction Commenced October 2021, Construction Completion Expected April 2023, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $28,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

82,784 SF - 2 Apartments/Condominiums, 4 Stories Above Grade, 200 Unit(s), Clubhouse/Social Club, 3 Parking Garage, Park/Playground, New Construction, 7.65 Acres.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Selective Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents