Similar Projects
Lock Control System Modernization, Lock and Dam #5, Allegheny River, Freeport, PA
Renovation
Design
$500,000 to $1,000,000 est. value
Freeport, PA

Repairs To Upper Birchwood Lake Dam
Renovation
Bidding
$1,000,000 est. value
Dingmans Ferry, PA 18328

Design - Build Project for Dam Repairs at Various Dams In Eastern Pennsylvania
Renovation
Bidding
$1,000,000 est. value

Central Business District Tunnel Lighting and Conduit Replacement
Post-Bid
Pittsburgh, PA 15222

FE Walter Dam, White Haven - PA, Inspection and Repair of Right Service Gate in Tower
Post-Bid
$250,000 to $1,000,000 est. value
White Haven, PA 18661

Dam Rehabilitation - Construction - Hibernia Dam, Chester, PA
Results
$500,000 to $1,000,000 est. value
PA 19320

Meadow Grounds Lake Dam
Results
$2,000,000 to $5,000,000 est. value
McConnellsburg, PA

Mansfield Levee Repair in Mansfield, Pennsylvania
Renovation
Bidding
$500,000 to $1,000,000 est. value
Mansfield, PA

Repair of Lake Swiftwater Dam
Renovation
Post-Bid
Henryville, PA 18332

Stilling Basin Repair, Foster Joseph Sayers Dam, Beech Creek, PA
Results
$1,000,000 to $5,000,000 est. value
Beech Creek, PA 16822

Beach Creek Dam
Post-Bid
Less than $25,000 est. value
State College, PA 16801

Stoplog & Bulkhead Fabrication, Delivery, Installation and Testing
Results
Leesport, PA

Lower Woods Pond - Renovate Dam
Infrastructure
Post-Bid
$2,000,000 to $3,000,000 est. value
Honesdale, PA 18431

Mulitple Locations - Dam Rehabilitation Project
Results
Less than $15,075,000 est. value
PA

Central Business District (CBD) Tunnel Plinth Rehabilitation
Infrastructure
Post-Bid
Less than $20,000,000 est. value
Pittsburgh, PA

Last Updated 07/20/2021 11:50 AM
Project Title

Sand Spring Run Dam Repairs

Physical Address View project details and contacts
City, State (County) PA   (Carbon County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work included under this contract consists of the replacement of the drawdown structure outlet conduit endwall, repairs to the concrete on the primary dam spillway, repair and placement of new stone riprap to the upstream slope of the dam embankment, repair and placement of new stone surfacing material to the dam crest and the installation of a new staff gage.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents