Similar Projects
East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

2021 Pavement and Playground Renovations
Renovation
Post-Bid
McHenry, IL 60050

McHenry High School West Campus Phase 3 - Addition and Renovations
Renovation, Addition
Results
McHenry, IL 60050

McHenry East High School 2021 Summer Renovations - Bid Release 1
Renovation
Results
McHenry, IL 60050

Harvard High School 2021 Improvements - Bid Release 2
Post-Bid
Harvard, IL 60033

McHenry West High School - 2021 Pavement Maintenance
Results
McHenry, IL 60050

2022 Roof Replacement
Alteration
Post-Bid
Marengo, IL 60152

Harvard High School 2021 Improvements - Bid Release 1
Renovation
Results
Harvard, IL 60033

Auditorium House Lighting LED Improvements
Renovation, Alteration
Post-Bid
$200,000 est. value
McHenry, IL 60050

2021 Health/Life Safety Improvements (General Trades)
Results
Crystal Lake, IL 60014

2022 Capital Improvements
Renovation
Post-Bid
Cary, Crystal Lake, IL 60013

2022 HVAC Improvements - Mechanical Equipment BG 1 BP #1-4
Alteration
Results
Crystal Lake, IL 60014

2022 Structural Repairs At Marengo Community High School
Renovation
Post-Bid
Marengo, IL 60152

Roof System Replacements And Restoration
Alteration
Results
$682,000 est. value
Huntley, IL 60142

2022 Tennis Court Reconstruction
Renovation, Alteration
Post-Bid
Marengo, IL 60152

Last Updated 04/21/2022 06:28 AM
Project Title

2022 Marengo Community Middle School Renovation Project

Physical Address View project details and contacts
City, State (County) Marengo, IL 60152   (McHenry County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Following Work: The renovation includes new ceiling and lighting in the Vestibule, Lobby, Office & 13 Classroom areas and hallways (Approx. 13,330 sq.ft). Demo of existing ceiling & lighting not in this contract (done by Asbestos Contractor). Adding HVAC with VRF Heat pump system & related ductwork, piping & electrical work in Fifteen classrooms. This project includes general construction plus HVAC and electrical work.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents