Similar Projects
55 Park Place - Replace Existing Chillers and Cooling Towers
Renovation
Sub-Bidding
$3,800,000 CJ est. value
Atlanta, GA 30303

GSU - Piedmont North A and B Boiler Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Atlanta, GA 30303

Freezer / Cooler Mechanical Equipment Replacement at Love T. Nolan Elementary School
Renovation
Post-Bid
$200,000 CJ est. value
Atlanta, GA 30349

Repairs/Testing Services for Absolete AC Switchgear Breaker
Renovation
Post-Bid
$200,000 CJ est. value
Atlanta, GA 30314

Sparks Hall Phase 3 3rd Floor HVAC Upgrades
Alteration
Results
$375,000 est. value
Atlanta, GA 30303

HVAC Maintenance and Repair
Alteration
Results
Atlanta, GA

Replacement of Freezer Coolers
Renovation
Post-Bid
$300,000 CJ est. value
Alpharetta, GA 30004

HVAC Services
Alteration
Results
GA

Computer Room Air Conditioning (CRAC) HVAC System Repair and Maintenance Services
Term Contract
Post-Bid
Atlanta, GA 30332

Southwest Arts Center Theater HVAC/Chiller Replace
Alteration
Results
Atlanta, GA 30331

Oglethorpe Elementary School Modifications - Bid Package 1 - HVAC Only
Renovation
Post-Bid
$800,000 CJ est. value
Atlanta, GA 30314

Replacement of Air Compressors and Dryer
Renovation
Results
$81,670 CJ est. value
Atlanta, GA 30334

HVAC Modifications Hull Middle School
Renovation
Post-Bid
$800,000 CJ est. value
Duluth, GA 30097

HVAC Services and Preventative Maintenance for City Facilities
Term Contract
Post-Bid
Alpharetta, GA 30009

Building HVAC Renovations at White
Renovation
Post-Bid
$800,000 CJ est. value
Atlanta, GA 30314

Last Updated 10/06/2023 11:36 AM
Project Title

RFP Construction Manager at Risk - Cascade Elementary School HVAC Upgrades

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30311   (Fulton County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Atlanta Public Schools seeks a Construction Manager to complete the HVAC System replacement and or modifications. The successful Construction Manager will be expected to provide all the services included in the standard APS Construction Management Agreement (the Contract ) for building improvements at the following location: Cascade Elementary School 2326 Venetian Drive, S.W Atlanta, GA 30311 If you are unable to download these documents, you may contact the contract services administrator: Alicia White at Alicia.White@atlanta.k12.ga.us. Question Deadline 09/20/2023 at 2:00 PM ET 09/20/2023 Deadline for written questions, 2 p.m., ET All questions or requests for clarification must be sent via Bonfire under Message - Opportunity 3.5.1. Provide construction services for a new building-wide HVAC system. The desired system shall be a three-pipe, variable refrigerant flow (VRF)system making use of cassettes, fan coil units, DXfv split air handlers. 3.5.2 Condensers dedicated to the outdoor air units, rooftop, and package units. 3.5.3 Install new electrical for the new Generator installation. 3.5.4 Installation of a building generator. 3.5.5 Structural modifications in support of the new HVAC system. 3.5.6 Electrical modifications in support of the new HVAC system. 3.5.7 Plumbing modifications in support of the new HVAC system. 3.5.8 Architectural modifications in support of the new HVAC system. 3.5.9 Modifications to the fire alarm and life safety systems. 3.5.10 Modifications to the clock bell intercom system in support of the HVAC system. 3.5.11 Modifications to the new building automation system (BAS) in support of the HVAC system. New Controls shall be ALC. 3.5.12 City of Atlanta permitting. 3.5.13 The CM shall be required to coordinate with the Atlanta Public Schools Commissioning Agent on all phases of the project from pre-planning to conclusion. This will include but may not be limited to plan review, submittal review, project inspections, documentation, response to commissioning agent comments, and resolutions. Final sign-off on the reports. 3.5.14 The CM shall be required to coordinate with the Atlanta Public Schools Test & Balance vendor on all phases of the project from pre-planning to conclusion. 3.5.15 All work is to be substantially completed no later than June 30, 2025. 3.5.16 The Stated Cost Limitation (SCL) is $4,546,000.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents