Similar Projects
Last Updated | 10/06/2023 11:36 AM |
Project Title | RFP Construction Manager at Risk - Cascade Elementary School HVAC Upgrades |
Physical Address | View project details and contacts |
City, State (County) | Atlanta, GA 30311 (Fulton County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Construction Management - CM at Risk, Competitive Bids |
Project Status | Sub-Bidding, Construction start expected June 2024 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Atlanta Public Schools seeks a Construction Manager to complete the HVAC System replacement and or modifications. The successful Construction Manager will be expected to provide all the services included in the standard APS Construction Management Agreement (the Contract ) for building improvements at the following location: Cascade Elementary School 2326 Venetian Drive, S.W Atlanta, GA 30311 If you are unable to download these documents, you may contact the contract services administrator: Alicia White at Alicia.White@atlanta.k12.ga.us. Question Deadline 09/20/2023 at 2:00 PM ET 09/20/2023 Deadline for written questions, 2 p.m., ET All questions or requests for clarification must be sent via Bonfire under Message - Opportunity 3.5.1. Provide construction services for a new building-wide HVAC system. The desired system shall be a three-pipe, variable refrigerant flow (VRF)system making use of cassettes, fan coil units, DXfv split air handlers. 3.5.2 Condensers dedicated to the outdoor air units, rooftop, and package units. 3.5.3 Install new electrical for the new Generator installation. 3.5.4 Installation of a building generator. 3.5.5 Structural modifications in support of the new HVAC system. 3.5.6 Electrical modifications in support of the new HVAC system. 3.5.7 Plumbing modifications in support of the new HVAC system. 3.5.8 Architectural modifications in support of the new HVAC system. 3.5.9 Modifications to the fire alarm and life safety systems. 3.5.10 Modifications to the clock bell intercom system in support of the HVAC system. 3.5.11 Modifications to the new building automation system (BAS) in support of the HVAC system. New Controls shall be ALC. 3.5.12 City of Atlanta permitting. 3.5.13 The CM shall be required to coordinate with the Atlanta Public Schools Commissioning Agent on all phases of the project from pre-planning to conclusion. This will include but may not be limited to plan review, submittal review, project inspections, documentation, response to commissioning agent comments, and resolutions. Final sign-off on the reports. 3.5.14 The CM shall be required to coordinate with the Atlanta Public Schools Test & Balance vendor on all phases of the project from pre-planning to conclusion. 3.5.15 All work is to be substantially completed no later than June 30, 2025. 3.5.16 The Stated Cost Limitation (SCL) is $4,546,000. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |