Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Milling and Resurfacing
Infrastructure
Results
NC

Pavement Rehabilitation
Infrastructure
Results
NC

Fremont Elementary
New Construction, Infrastructure - 109,336 SF
Construction
$24,000,000 CJ est. value
Fremont, NC 27830

Fremont Elementary
New Construction, Infrastructure - 109,336 SF
Construction
$24,000,000 CJ est. value
Fremont, NC 27830

Berkeley Boulevard Apartments
New Construction, Infrastructure
Pending Verification
$75,000,000 CJ est. value
Goldsboro, NC 27534

Shelton
New Construction, Infrastructure
Pending Verification
$38,000,000 CJ est. value
Goldsboro, NC 27530

Bituminous Plant Mix Asphalt
Term Contract
Post-Bid

Us 117/117 Alternate Water Line Relocation
Infrastructure
Results
$863,961 est. value
Dudley, NC 28333

SunTree Snack Foods Manufacturing Plant
Demolition, New Construction, Infrastructure
Pending Verification
$10,100,000 CJ est. value
Goldsboro, NC 27530

Demolition and Asbestos Removal Services Related to the Hazard Mitigation Grant Program (HMGP) Acquisition and Demolition Project
Term Contract, Demolition, Infrastructure
Post-Bid
$30,000 CJ est. value
Goldsboro, NC 27530

AWOS Site Preparation and Installation
Infrastructure
Results
Mount Olive, NC

Goldsboro Business Campus - Phase I
Infrastructure
Post-Bid
Goldsboro, NC

Thin Lift Asphalt Pavement Preservation
Infrastructure
Results
NC

Last Updated 09/26/2022 02:35 PM
Project Title

Stoney Creek Greenway Improvements Project

Physical Address View project details and contacts
City, State (County) Goldsboro, NC 27530   (Wayne County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $187,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 26, 2022, this project has not yet been awarded. A timeline for award has not yet been established. Stoney Creek Greenway Improvements Project, Work includes grading, paving, drainage and erosion control in accordance with plans and specifications for installation of a 10 foot wide greenway along Stoney Creek between Royall Avenue and extending northwards to the Quail Park parking lot.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents