Similar Projects
Electric Production Breaker Project 2023
Term Contract
Sub-Bidding
Iola, KS 66749

Lighting
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Iola, KS 66749

HVAC Modifications and Lighting Upgrades
Alteration
Post-Bid
Buhler, KS

EHRM Infrastructure Upgrades Construction Leavenworth VAMC
Term Contract
Post-Bid
Leavenworth, KS 66048

Kaw Water Treatment Plant Electrical and Mechanical Improvements
Alteration
Results
Lawrence, KS 66044

Fire Stations 1-2, 4-12 Lighting Upgrades
Alteration
Results
Topeka, KS

Site Lighting Replacement
Infrastructure
Construction
$75,000 CJ est. value
Hays, KS 67601

Upgrade/replacement of the Existing Controls System Serving El Dorado High School
Renovation
Sub-Bidding
$700,000 CJ est. value
El Dorado, KS 67042

On-Call Electrical Services - General Electrical Services and Emergency Services
Term Contract
Post-Bid
Olathe, KS

Install Lighting in Industrial Yard - HCF
Alteration
Results
$100,000 est. value
Hutchinson, KS 67501

City Hall Generator Addition
Renovation
Sub-Bidding
$270,000 CJ est. value
De Soto, KS 66018

Multi-Way Pad-Mount Switchgear with Fast Source Transfer Switch, Manufacture, and Delivery
Alteration
Post-Bid
Garden City, KS

Replace Harmonic Filter B56
Term Contract
Results
$25,000 to $100,000 est. value
KS

2022 JCPRD Electrical Services IDIQ
Term Contract
Post-Bid
KS

Backup Power Generator for Water Distribution System
Alteration
Results
Gardner, KS 66030

Last Updated 06/20/2023 03:20 PM
Project Title

Electrical Upgrades Harmon High School

Physical Address View project details and contacts
City, State (County) Kansas City, KS 66106   (Wyandotte County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2024
Bids Due View project details and contacts
Estimated Value $495,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

It is the intent of the Kansas City Kansas Public Schools, Kansas City, Kansas to enter into an agreement for Electrical Upgrades for JC Harmon High School. Prevailing Wage/Union Prevailing Wage IS NOT required. There is no union labor requirement for this solicitation. Time of Completion Successful bidder shall begin the Work on receipt of the Notice to Proceed and shall complete the Work (Substantial Completion) no later than August 1, 2024. Liquidated Damages Completion of this project before August 1, 2024, is imperative. At the District's sole discretion, liquidated damages in the amount of Two-Hundred-Fifty Dollars ($250.00) per calendar day will be assessed against the Contract if the project is not completed by the date indicated. Clean-Up The Contractor will keep the premises free from accumulations of debris and waste materials caused by its employees in performance of the work. At completion of the project, Contractor shall remove all crating, packaging, waste and debris from the building and the site, and all tools, scaffolding and surplus materials, and shall leave the building and site "broom clean" or its equivalent. Permits, Codes and Ordinances Each Contractor shall file and pay for required permits affecting its work (if applicable). Each contractor shall conform to applicable codes and ordinances, including OSHA requirements. Damage to District Property Contractor at its own expense shall promptly remedy and repair all damages or loss to any property caused in whole or part by its employees, subcontractor(s), supplier or anyone directly or indirectly employed by either of them, or by anyone for whose acts either of them may be liable. No Smoking: The District adheres to the mandatory "No Smoking" policy on school premises and/or at school functions. All bidders shall comply with this "No Smoking" policy It is the intent of the Kansas City Kansas Public Schools, Kansas City, Kansas to enter into an agreement for Electrical Upgrades for JC Harmon High School. Copies of the bid must be submitted in a sealed envelope with the Electrical Upgrades at JC Harmon High School on the envelope. Any bid form that does not include a separate dollar value for each item will be deemed non-responsive and will not be considered. Any proposal that lists, "$0", or "no bid" in lieu of a dollar value will be deemed non-responsive and will not be considered. All work will begin by May 30, 2024, and is to be completed prior to August 1st, 2024.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents