Similar Projects
Greenway Road Tank Rehabilitation
Post-Bid
$872,649 est. value
Mashpee, MA 02649

Rotary Tank Rehabilitation
Results
Bourne, MA

Z--CACO Marconi Water Tower Repair and Painting
Results
$250,000 to $500,000 est. value
Wellfleet, MA

CACO - Temporary Potable Water Storage
Results
Wellfleet, MA

Technology Park Low Service Tank Rehabilitation
Results
Less than $1,600,000 est. value
Falmouth, MA

Installation of a Hot Water Tank and Oil Burner at Stony Brook Elementary School
Post-Bid
Brewster, MA 02631

Power Washing of Two Water Storage Facilities
Results
Less than $14,000 est. value
Brewster, MA 02631

Bournedale Tank Rehabilitation and Improvements Project
Results
Less than $300,000 est. value
Sagamore, MA 02562

Sandy Pond Tank Rehabilitation
Results
$296,800 est. value
Yarmouth, MA

Cleaning and Coating 2 MG Concrete Water Storage Tank
Results
Less than $100,000 est. value
Sandwich, MA

Installation of a Hot Water Tank and Oil Burner at Stony Brook Elementary School - Sub-Bid
Post-Bid
Brewster, MA 02631

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Back Road Tank Replacement
New Construction
Results
$3,000,000 est. value
Mashpee, MA 02649

Pleasant Lake Elevated Water Storage Tank Improvements
Results
Less than $700,000 est. value
Harwich, MA 02645

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Last Updated 06/21/2021 07:39 AM
Project Title

Sandy Pond Water Storage Tank Rehabilitation

Physical Address View project details and contacts
City, State (County) West Yarmouth, MA   (Barnstable County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $350,000
Plans Available from Municipal Agency - 02/17/21
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the pressure washing of the entire exterior of the Sandy Pond 1.5 MG welded steel hydropillar water storage tank, and the spot surface preparation, priming, and overcoat painting of the exterior tank roof and bowl. The work also includes cleaning and disinfection of the wet tank interior; spot surface preparation and spot , priming and painting of the dry tank pedestal interior; installation of a new check valve on the tank overflow and drain pipes; and reattachment of the tank roof vent cover.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents