Similar Projects
Willow Glen Wash Bay Addition - RB0218-03008 - Flathead County
Addition, Demolition, Renovation, Infrastructure
Conception
$1,026,250 CJ est. value
Kalispell, MT 59901

Kay Beller Park to BNSF Loop Trail - City of Whitefish
Infrastructure
Conception
$2,100,000 CJ est. value
Whitefish, MT 59937

The Charles Hotel
New Construction, Infrastructure - 86,000 SF
Design
$34,000,000 CJ est. value
Kalispell, MT 59901

Creekside Commons
New Construction, Infrastructure - 27,000 SF
Design
$12,000,000 CJ est. value
Kalispell, MT 59901

ImagineIF Bigfork Library, ARK Building Renovation Project 2023
Renovation, Infrastructure - 6,000 SF
Sub-Bidding
$1,500,000 CJ est. value
Bigfork, MT 59911

Armory Park Master Plan - Phase III
Infrastructure
Post-Bid
$1,300,000 CJ est. value
Whitefish, MT 59937

Swan Lake District Office Entrance Bridge Replacement
Infrastructure, Renovation
Post-Bid
$250,000 CJ est. value
Bigfork, MT 59911

2021 Water System Improvement Project
Infrastructure
Results
$4,499,772 CJ est. value
Bigfork, MT 59911

2021 Water System Improvement Project
Infrastructure
Results
$4,499,772 CJ est. value
Bigfork, MT 59911

Kalispell City Airport Hangars
New Construction, Infrastructure
Construction
$7,000,000 CJ est. value
Kalispell, MT 59901

406 Spa and Coffee Shop Expansion
Addition, Demolition, Infrastructure - 2,277 SF
Construction
$600,000 CJ est. value
Kalispell, MT 59901

Samaritan House Expansion
New Construction, Infrastructure, Build-out
Pending Verification
$17,000,000 CJ est. value
Kalispell, MT 59901

Flathead Valley Youth Center - Phase 4
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Kalispell, MT 59901

Rose Crossing West Improvements - City of Kalispell
Infrastructure
Conception
$2,347,071 CJ est. value
Kalispell, MT 59901

North Valley Music School at Smith Fields School
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Whitefish, MT 59937

Last Updated 10/04/2023 01:33 PM
Project Title

WWTP Main & Headworks Structure

Physical Address View project details and contacts
City, State (County) Kalispell, MT 59901   (Flathead County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $1,704,420 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project primarily consists of furnishing materials, labor, and equipment required for the replacement of approximately 360 linear feet of 36" RCP sewer main with approximately 312 linear feet of 54" PVC main and 28 feet of 36" PVC main. The project includes the installation of a box structure, partial replacement of connecting mains, lining of concrete structures, bypass pumping, dewatering, and other related items necessary for the completion of the work. Construction of the WWTP Main and Headworks Structure project shall be performed by a Contractor who is registered with the Montana Department of Labor and Industry. The Contractor shall be properly registered at the time of submitting the Bid. Est. Completion Date: June 1, 2024

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents