Similar Projects
Valley Springs Middle School Mechanical Upgrade
Bidding
Arden, NC 28704

Removal and Replacement of Two (2) Hot Water Heaters
Bidding
Wilmington, NC

US Cellular Center Mechanical/HVAC Renovation
Post-Bid
Asheville, NC

J--Chiller Inspection and Maintenance
Post-Bid
Asheville, NC 28805

Steam Distribution System Replacement Phase IV-A
Results
Less than $2,000,000 est. value
Greensboro, NC

South Wilmington Street Center - Mechanical System Replacement
Results
Raleigh, NC

Boiler Service and Inspection
Term Contract
Post-Bid
Pembroke, NC

Boiler Replacement in Killian Building
Results
Less than $61,890 est. value
Flat Rock, NC

Upgrade Chiller Plant Fort Bragg, NC
Post-Bid
Fort Bragg, NC 28307

Ultrasoft Water Softener Unit
Results
Camp Lejeune, NC 28547

Hope Mills Library Boiler Replacement
Post-Bid
Hope Mills, NC 28348

Northern Wake Campus Exterior Hydronic Piping and Equipment Addition
Results
Raleigh, NC

Blue Ridge Community College Spearman Building Boiler 1 Replacement
Post-Bid
Flat Rock, NC 28731

North Buncombe Elementary School Boiler Replacement
Results
Less than $74,367 est. value
Weaverville, NC 28787

Reverse Osmosis System for 30 Locations
Post-Bid
NC

Last Updated 01/14/2021 02:53 PM
Project Title

B-4639 Clean Diffussers, Digester #3, WWTP

Physical Address View project details and contacts
City, State (County) Havelock, NC 28533   (Craven County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall: a. Clean Diffuser’s in digester #3 in Bldg. 4639. i. Provide and erect all required safety barriers needed to keep unauthorized personnel out of the work area. ii. Secure all power, Lock & Tag Out the electrical disconnect (s), along with all water isolation valves to the diffusers/blowers prior to any work. iii. Ensure Clarifier is completely empty. iv. Ensure that all power is secured by using an authorized electrical testing device. v. This work will be performed in a confined space and will require certified confined space personnel to perform the work. All confined space procedures shall be followed. vi. Disconnect, remove and clean a total of (30) Course air diffusers. Clear each of the diffuser ports of debris and buildup. vii. Disconnect the 4” stainless header pipe at multiple locations and clean with a high velocity water jet. Ensure there is no rags/sediment left inside the pipe. viii. Properly replace gaskets and reconnect the flanges on the 4” stainless pipe. Reinstall 30 course air diffusers to the proper operating position. ix. Remove Tags and Lockouts from electrical disconnects, and valves. x. Fill the basin with water above the diffusers and perform multiple operational test to ensure the diffusers are cleaned, clear of debris and operating properly. Any other discrepancies beyond this scope of work shall be reported to the PAR. b. Additional Information related to the completion of work. i. The contractor is to stay off the grass. If grass is damaged during this contract it must be replanted with sod. ii. Prior to leaving the site, the contractor shall conduct site cleanup and return area to its original condition. iii. After inspection and approval, turn all paperwork into the Contracting Officers Representative.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Air Outlets and Inlets, Diffusers, Registers, and Grilles.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents