Similar Projects
River Ring Towers
New Construction - 133,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Brooklyn, NY 11249

Baltic Street Apartments
New Construction - 16,490 SF
Conception
Brooklyn, NY 11217

BowTie Development aka 589 Fulton Street Skyscraper
New Construction - 502,356 SF
Design
$100,000,000 est. value
Brooklyn, NY 11201

Java Street Residences
New Construction - 611,502 SF
Design
$10,000,000 CJ est. value
Brooklyn, NY 11222

Coney Island 1B Elevator Rehabilitation (EV Package)
Renovation
Post-Bid
Brooklyn, NY 11224

Coney Island 1B Elevator Rehabilitation
Renovation
Post-Bid
Brooklyn, NY 11224

Empire Fulton Ferry and Dumbo Waterfront Project
Infrastructure
Results
$2,306,500 CJ est. value
New York, NY 11201

Alloy Block Downtown
New Construction - 30,000 SF
Construction
$240,000,000 est. value
Brooklyn, NY 11217

Adams Street Mixed-Use Development
New Construction - 258,200 SF
Construction
$66,000,000 est. value
Brooklyn, NY 11201

496 Wilson Avenue Apartments
New Construction - 6,127 SF
Pending Verification
Brooklyn, NY 11237

99-101-103 Grove Street Apartments
New Construction - 6,763 SF
Pending Verification
Brooklyn, NY 11221

500 Flatbush Avenue Mixed Building
New Construction - 51,312 SF
Conception
Brooklyn, NY 11225

Fourth Avenue Mixed-use Building
Demolition, New Construction, Infrastructure - 6,312 SF
Design
$2,000,000 CJ est. value
Brooklyn, NY 11217

Elevator Rehabilitation (Ev Pkg.) at Carey Gardens
Renovation
Post-Bid
Brooklyn, NY 11224

1121 49th Street Apartment Renovation
Renovation - 4,407 SF
Construction
$220,350 est. value
Brooklyn, NY 11219

Last Updated 01/30/2023 03:26 PM
Project Title

Armideo Boarding House

Physical Address View project details and contacts
City, State (County) Cortland, NY 13045   (Cortland County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected August 2020
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A more exact scope of work has not been announced including the total square footage of the project. This project is scheduled to go before the Cortland Planning Commission on February 24, 2020. Information regarding either an architect or general contractor has not been disclosed. Although there is not a firm timeline, construction is expected to begin in third quarter 2020.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents