Similar Projects
Hydraulic Pumps, Cylinders, Motors and Related Services
Term Contract
Post-Bid
Salt Lake City, UT

Temporary Heating Systems
Post-Bid
Salt Lake City, UT

J--NIIP B2.9L Unit 4 Motor Rewind and Reconconditioni
Results
Salt Lake City, UT 84044

Salt Lake Sports Complex Ammonia Chiller Replacement
Results
$300,000 to $500,000 est. value
Salt Lake City, UT 84108

Annual Contract for Plumbing/Mechanical Work
Term Contract
Post-Bid
Salt Lake City, UT 84115

Children's Center Boiler Replacement Family Health Building Department of Health
Results
$450,000 est. value
Salt Lake City, UT

DFCM Construction-Pre Qualified Mechanical-Utah National Guard Mechanical Upgrades Draper JFHQ Building
Results
Less than $292,000 est. value
Draper, UT 84020

SLCC MC - Boiler Replacement
Results
$225,000 est. value
Sandy, UT 84070

Salt Lake City (SLC) Cooling Tower Mechanical Separator
Results
$25,000 to $50,000 est. value
Salt Lake City, UT

Adult Detention Center Water Heater Replacement
Results
$100,000 to $130,000 est. value
UT

Boiler Remodel for Draper City
Results
Draper, UT 84020

CAB West Mechanical Make-up and Exhaust
Term Contract
Results
Granite, Sandy, UT 84070

Boiler and Motor Pumps Upgrade
Results
Less than $600,000 est. value
Salt Lake City, UT 84114

Construction-Pre Qualification-General/Mechanical/Electrical/Roofing/Pavingcontractors
Results
Less than $3,500,000 est. value
Salt Lake City, UT

SLCC Mechanical Controls Upgrade
Results
$600,000 est. value
Salt Lake City, UT 84130

Last Updated 03/18/2019 07:53 PM
Project Title

Riverton High School Boiler Replacement

Physical Address View project details and contacts
City, State (County) Riverton, UT 84065   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Scope of services for this project includes the complete replacement of the Riverton High School High Mass Boilers. 1. Replace the two boilers. 2. Replace boiler stacks and boiler drafter fans. 3. Replace existing circulation pumps, and gas train, domestic water make up and accessories. 4. Remove expansion tanks and replace with a single new expansion tank. 5. Remove existing main hot water piping to facilitate a primary-secondary piping configuration. 6. This will require the addition of new primary boiler pumps, electrical connections, and controls. 7. The existing control system is Johnson Controls Existing electrical panel has sufficient capacity to support the new pumps. 8. Replace the VFD's serving the existing pumps and make connection to new pumps and existing VFD housing. 9. Make adjustments to the existing lighting protection system.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents