Similar Projects
ADF-SW Parking Lot Expansion
Term Contract
Design
Las Cruces, NM

20th Street Project Phase III
Infrastructure
Bidding
$931,920 est. value
Farmington, NM

Construction Management Services for Bear Head Canyon Road Walatowa Fitness Center Parking Lot Improvements Project
Infrastructure
Bidding
Jemez Pueblo, NM 87024

Administrative Complex Parking Lots and Sheep Springs Way Improvement
Post-Bid
Jemez Pueblo, NM 87024

On Call Construction Services for Public Works
Term Contract
Post-Bid
Less than $2,500,000 est. value
Los Alamos, NM 87544

Visitors Center Pedestrian and Trailhead Improvements NMDOT Highway Safety Improvements Program
Results
Silver City, NM 88061

Coal Avenue Event Street Project
Results
Gallup, NM 87301

Jubilee to Sun Ranch Multiuse Path
Infrastructure
Bidding
Los Lunas, NM 87031

NM FTFW RIMO 10(1) Rio Mora National Wildlife Refuge Road & Visitor Parking Rehab
Post-Bid
$1,500,000 to $2,500,000 est. value
Watrous, NM

Asphalt Overlay at the Bie-T`Siya Day School, Zia
Results
$25,000 to $100,000 est. value
Zia Pueblo, NM

West Mcgaffey Street Rehabilitation A Unit Price
Infrastructure
Bidding
Roswell, NM 88203

Quartz Hill Trail Project
Post-Bid
NM

Town of Silver City Downtown Sidewalk Improvements
Results
$435,784 est. value
Silver City, NM 88061

On Call Concrete Repairs
Infrastructure
Bidding
Rio Rancho, NM

Telshor Avenue ADA Improvements Phase V
Post-Bid
Las Cruces, NM 88011

Last Updated 12/24/2021 03:29 AM
Project Title

Construction of Westside Boulevard Bike and Pedestrian Path

Physical Address View project details and contacts
City, State (County) Rio Rancho, NM   (Sandoval County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Rio Rancho is soliciting formal bids for the Westside Boulevard Bike/Pedestrian Path project consists of improvements to approximately a 1.1-mile section of Westside Boulevard path from Unser Boulevard to Rio Rancho/City of Albuquerque City Limits. The path is to be constructed on the north side of Westside Boulevard to fill in gaps in the path where they exist. This new path will replace the existing crusher fines from Unser Blvd to Trail Side Dr. It is contemplated that an 8’ wide asphalt or concrete path conforming with ADA/PROWAG compliant curb ramps will be constructed and the installation of landscaping with the irrigation lines to connect to the existing recycled water line.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents