Last Updated | 10/11/2021 12:30 PM |
Project Title | Supai Clinic and Quarters Construction |
Physical Address | View project details and contacts |
City, State (County) | Supai, AZ (Coconino County) |
Category(s) | Medical |
Sub-Category(s) | Nursing/Rehabilitation Center |
Contracting Method | Competitive Bids. |
Project Status | Results, Construction Start Expected November 2021 |
Bids Due | View project details and contacts |
Estimated Value | $5,000,000 to $10,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | SCOPE OF WORK: The project will replace the existing IHS Supai Clinic with a new Clinic and Staff Quarters. The new Clinic will provide Primary Care, Dental, Pharmacy/Medication Dispensing, Lab and Radiology. Additionally, the new Clinic will have Specialty Care Visiting Providers (Podiatry, Optometry, Ophthalmology and Psychiatry) as well as Alcohol and Substance Abuse, Behavioral Health, Social Work, Public Health Nursing, and Public Health Education Programs. The floor plan combines the clinic and the quarters into a two-story building with the Clinic located on the first floor and the Staff Quarters on the second floor (two-bedroom and single bedroom efficiency units). Construction will be phased in order to maintain the current IHS Transient Quarters (located on future construction site) intact until new Quarters are constructed. LOCATION OF PROJECT: All work shall be performed in Supai Village located in Havasu Canyon on the Havasupai Reservation. The location of the new clinic will be on a parcel that includes the existing Tribal consultant quarters and existing IHS transient quarters. The overall size of the parcel is approximately 11,000 square feet. The location is accessible only by helicopter, mule, or on foot. Due to isolation, transportation of contractor staff and materials are challenging and must be properly managed. CONSTRUCTION DURATION: Period of Performance is 494 calendar days from issuance of the Notice to Proceed. |
||||||||||||||||||||||||||||||||||||||||
Details | 1 Nursing/Rehabilitation Center, Approximately 11,000 SF New Construction.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |