Similar Projects
Full Service Maintenance Contract for Carrier Equipment
Term Contract
Bidding
College Park, MD 20742

HVAC Maintenance and Repair at Cheltenham Youth Center
Post-Bid
Cheltenham, MD 20623

NMIC-1 Replace 4 Chillers and Controls/Install Chiller Catwalks Project, National Maritime Intelligence Center, Suitland, Maryland
Post-Bid
$10,000,000 to $25,000,000 est. value
Suitland, MD

Portable Air Conditioning Preventative Maintenance and Repairs
Results
Berwyn Heights, MD 20740

Glassmanor Elementary School - Building Envelope and Central HVAC Conversion
Results
$3,000,000 est. value
Upper Marlboro, MD 20745

RGH Air Condition Unit Replacement
Post-Bid
Laurel, MD 20707

J.E. Proctor Building Chiller Replacement
Results
Bowie, MD 20715

HVAC Preventative Maintenance and Service
Post-Bid

Croom High School HVAC Modernization
Results
Less than $1,700,000 est. value
Cheltenham, MD 20623

Dust Collection Unit
Post-Bid
Andrews Air Force Base, MD 20762

Thurgood Marshall Library Cooling Tower Replacement
Results
Bowie, MD 20715

HVAC System Replacement for the 6000- Series
Post-Bid
Greenbelt, MD 20770

Recommissioning (ReCx) Repairs Building: BARC 052 Controls
Results
$25,000 to $100,000 est. value
Beltsville, MD 20705

Water Treatment Service Contract
Post-Bid
College Park, MD 20742

BARC - Overhaul Building 010A Chiller #2
Results
Beltsville, MD 20705

Reported 09/22/2020 12:00 AM
Project Title

BARC MCquay Range #2 Chiller

Physical Address View project details and contacts
City, State (County) Beltsville, MD 20705   (Prince Georges County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

8(a) Set-Aside Replacing compressor, evaporator psi sensor, (3) crank case heaters, condenser fan motor and VFD

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Chillers and Coolers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents