Similar Projects
Last Updated | 09/27/2022 02:34 PM |
Project Title | Adams Elementary Office Addition and Partial Renovation |
Physical Address | View project details and contacts |
City, State (County) | Fort Wayne, IN 46803 (Allen County) |
Category(s) | Commercial, Education, Heavy and Highway |
Sub-Category(s) | Elementary School, Office, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $2,300,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Each bid proposal shall include all labor, material and services necessary to complete the projects in strict accordance with the drawings and specifications as prepared ana on file in the office of: Design Collaborative, Inc. 2u0 East Main Street Suite 600 Fort Wayne, IN 46802 Bids shall be received from a single prime contractor. Bids received after that time or in another location shall be returned to the bidder unopened. Only complete sets of plans and specifications will be distributed. Unlocked electronic PDF sets of drawings will be available for an additional cost. Any unsuccessful bidder, upon returning such sets in good and usable condition within (10) ten days of the bid date will be refunded their deposit. There will be shipping and handling charges for the delivery of each set of Bidding Documents. Each bid shall be accompanied by a certified check, a cashier's check or a bid bond executed by a surety company which is authorized to do business in the State of Indiana, made payable to the Fort Wayne Community Schools and in an amount equal to five percent (5%) of the bid. In the event a bidder withdraws its bid or fails to execute a satisfactory contract within ten (10) days after the contract is awarded to such bidder by Fort Wayne Community Schools, Fort Wayne Community Schools may declare the certified check, cashier s check or bid bond forfeited to Fort Wayne Community Schools, as liqui-dated damages. A bid may not be modified, withdrawn or cancelled by the bidder for sixty (60) days following the time and date designated for the receipt of bids without the consent of Fort Wayne Community Schools. Fort Wayne Community Schools reserves the right to reject any and all bids or waive any or all informalities, irregularities and/or Inconsistencies in, or with respect to, any or all bids. Fort Wayne Community Schools reserves the right to assign all or any portion of any Did and/or contract to any non-profit building corporation controlled by Fort Wayne Community Schools without the consent of any other party, and any employee of Fort Wayne Community Schools may be designated by Fort Wayne Community Schools ana/or any such non-profit building corporation to serve as the authorized agent or representative of such non-profit building corporation with respect to any such bid or contract. All contracts awarded In connection with these projects and all obligations of payment by Fort Wayne Community Schools or any non-profit building corporation controlled by Fort Wayne Community Schools shall be conditioned upon and subject to obtaining financing or other funds sufficient to pay all of the amounts set forth in such contract. All awarded contracts will be subject to termination, without penalty or liability, at the option of Fort Wayne Community Schools or any such non-profit building corporation at any time after execution of such contract in the event Fort Wayne Community Schools determines that funds will not be sufficient to pay all of the amounts set forth In such contract. Performance and Labor and Material Payment Bonds in an amount equal to one hundred percent (100%) of the contract amount shall be required to be provided by the successful bidder to Fort Wayne Community Schools or its assignee no later than ten (10) days after the execution of such contract. Such bonds shall remain in full force and effect for a period of twelve (12) months after the date of Substantial Completion. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |