Similar Projects
Last Updated | 09/26/2022 09:35 AM |
Project Title | Phillips MR7700 Magnetic Shielding and Installation |
Physical Address | View project details and contacts |
City, State (County) | Buffalo, NY 14203 (Erie County) |
Category(s) | Single Trades |
Sub-Category(s) | Service/Term Contracts |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $125,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Phillips MR7700 Magnetic Shielding and Installation The University at Buffalo intends to make an award under our discretionary authority, pursuant to NYS Education Law 355 (5) (a), which is up to $125,000, for the above noted commodity/product or service. A sealed bid will not be held. If you are interested in providing a proposal for the above commodity/product or service, you must contact the appropriately designated Campus contact in this advertisement within 15 business days of this Advertisement Notice. The University at Buffalo is seeking a procurement from Universal Shielding for RF Shielding fabrication and installation related to the new Phillips MRI at UB's CTRC building. The work would need to include RF shielding flooring modification to accommodate the new isocenter and foot pad, including magnet foot pads and feet with installation and anchorage into existing concrete. The work would also need to include fabrication and installation for the copper floor tray with brass cover between magnet gantry and table. The contractor should provide the system filter box, and RF cryogen exhaust, quench vent high hat and install equipment and all accessories. Dismantling existing and providing new silicone shielding and RF shielding on ceiling and 3 of the 4 walls is needed as well. Maintenance and lubrication of existing RF shielded door is also required. Contractor will need to complete all final attenuation tests, provide drawings prior to work for review and accepts liability with all existing and new shielding. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 0% Women Owned Sub-Contracting Goal: 0% Service-Disabled Veteran-Owned Business Contracting Goal: 0% Disadvantaged Owned Sub-Contracting Goal: 0% Contract term: 1 year |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |