Last Updated | 10/03/2023 07:38 AM |
Project Title | Nuisance Abatement - Demolition of Structures |
Physical Address | View project details and contacts |
City, State (County) | Mobile, AL 36617 (Mobile County) |
Category(s) | Single Trades |
Sub-Category(s) | Environmental |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope of Work: Provide a wet demolition & REMOVE ALL STRUCTURES at the address indicated above, and as described in the attached photos and general notes provided, including all footings, slabs, etc. (FIELD VERIFY) Disconnect and cap off all utility lines, such as sanitary sewer, water, and gas, in a manner satisfactory to the respective agency and the City of Mobile, Municipal Enforcement Department. Contractor shall clear lots by removing all debris resulting from the demolition of structures and all debris as designated in piles, scattered or otherwise on the sites. Contractor is to provide Sediment and Erosion Control measures, grassing, and Best Management Practices for Demolitions where Lead-Based Paint and/or Asbestos containing Materials may be present, per specifications. Submit before and after demolition pictures to City of Mobile Municipal Enforcement Department, along with waste shipment record, Invoice for payment and required close-out documents. The Contractor shall deliver the Work complete within fifteen (15) calendar days from the date of the written Notice to Proceed. A time charge equal to two hundred fifty dollars ($250.00) per calendar day will be made against the Contractor for the entire period that any part of the Work remains uncompleted for more than fifteen (15) calendar days after the time specified for the Substantial Completion of the Work, the amount of which shall be deducted by the Owner, and shall be retained by the Owner out of monies otherwise due the Contractor in the final payment. not as a penalty, but as liquidated damages sustained. Contact the Program Coordinator, Gary Jackson, at the City of Mobile, Neighborhood Taskforce-Municipal Enforcement Department, 251.208.1540 phone or e-mail qary.jackson@cityofmobile.orq for further clarification regarding this Request for Quotes. GENERAL NOTES: 1. REMOVE DAMAGED VINYL SIDING/WOOD FRAME STRUCTURES 2. FIELD VERIFY ALL SITE CONDITIONS 3. REMOVE CMU/BRICK PIERS AND OR CONCRETE SLAB(S) FIELD VERIFY 4. REMOVE ALL TIRES, TRASH, ROOF REMNANTS, GARBAGE, ETC. OFF SITE 5. ALUMINUM FENCE SHALL REMAIN 6. REMOVE ALL VINES, BUSHES, SHRUBS ALONG THE ENTIRE PERIMETER AND CUT TREES WITH A CALIPER OF 8" OR LESS 4" ABOVE GRADE WITHIN THE PROPERTY LINES/FENCE LINE. 7. CLEAR ENTIRE LOT, REMOVE ALL TRASH/GARBAGE, CUT ALL GRASS/WEEDS UP TO PROPERTY LINES. 8. CONTRACTOR SHALL FILL ALL VOIDS OF DISTURBED AREAS PER SECTION 02100 DEMOLITIONS BY WET METHOD AND SECTION 02100 SEEDING. 9. CONTRACTOR SHALL PROVIDE, INSTALL AND MAINTAIN ALL TEMPORARY EROSION CONTROL MEASURES. (FULL PROTECTION OF STATE WATER-DOG RIVER WATERSHED) 10. CAP ALL SEWAGE LINES AT THE CURB: NOTIFY MUNICIPAL ENFORCEMENT DEPARTMENT WHEN SEWAGE LINE IS CAPED. 11. BEFORE AND AFTER PHOTOS ARE REQUIRED WITH PAY REQUEST. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |