Similar Projects
Standby Urgency Highway Repairs Contract: 2021 and 2022
Bidding
$900,000 est. value

Redi Project Mo-16 Cranberry Road at Edgemere Drive
Bidding
Greece, NY

Pavement & Curb Replacement
Post-Bid
$2,300,000 to $2,900,000 est. value
Rochester, NY

Asphalt Paving
Post-Bid

Design Build Services for I 390/I 490/31 (Lyell Ave) Interchange Improvements Phases 3 and 4
Term Contract
Results
Less than $85,000,000 est. value
NY

Magee Avenue/Raines Park Group Improvement Project
Results
Less than $1,278,000 est. value
Rochester, NY 14614

Highway Preventive Maintenance Program 8
Post-Bid
Rochester, NY 14614

2019 Preventive Maintenance NW Group 5
Term Contract
Results
Less than $2,800,000 est. value
Rochester, NY 14614

North Road Rehabilitation
Results
Rochester, NY 14614

Highway Preventative Maintenance Project 7
Results
Rochester, NY 14614

Surface Restoration-Term Construction Contract (TCC 4)
Results
Rochester, NY 14614

Asphalt Concrete Milling and Resurfacing on NY Route 96
Results
Less than $2,800,000 est. value
Perinton, Pittsford, NY 14450

Pavement Rehabilitation including Drainage, Traffic Signals
Results
Irondequoit, Rochester, NY 14602

2.05 Miles of Asphalt Concrete Reconstruction on Route 252
Results
Less than $4,200,000 est. value
Henrietta, NY 14467

2020 Preventive Maintenance Group II
Results
Less than $2,549,140 est. value
Rochester, NY 14614

Last Updated 11/26/2019 09:29 AM
Project Title

East Avenue/Wilder Road/Bennett Road Improvement

Physical Address View project details and contacts
City, State (County) Hilton, NY   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project will involve reconstruction of the East Avenue/Bennett Road/Wilder Road intersection. A left-turn-only lane will be added on the eastbound approach and a three color traffic signal will be installed. Milling and resurfacing of the existing pavement on East Avenue between North Ave and Bennett Road will also be included in the project, along with cleaning/lining of drainage systems, replacing signal loops, and new ADA-compliant sidewalk curb ramps and detectable warning surfaces as needed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents