Similar Projects
Haymeadow RMF 1 and 2 Utilities and Infrastructure
Infrastructure
Bidding
$240,000 est. value
Edwards, CO

2022 Countyline and Lucent Boulevard Intersection Improvements
Infrastructure
Bidding
$1,000,000 est. value
Highlands Ranch, CO 80129

Desert Ridge Place Storm Sewer Reconstruction
Post-Bid
Castle Rock, CO

ERWSD & UERWA Water Storage Tank and Booster Pump Stations Hatch Improvements
Post-Bid
Vail, CO

WWTF Headworks and Lift Station Rehabilitation
Results
Less than $408,900 est. value
Lamar, CO 81052

Washington Street Stormwater Lift Station
Results
Less than $530,750 est. value
Lamar, CO 81052

Alley and Stormwater Improvements Project 2021
Infrastructure
Post-Bid
Crescent, CO

East 64th Avenue and Denali Street Infrastructure Project
Results
Denver, CO 80202

Waste Water Lift Station Pump and Grinder Replacement
Renovation
Post-Bid
Black Hawk, CO 80422

East 16th Avenue System, Phase 1
Results
$8,500,000 to $9,400,000 est. value
Denver, CO 80202

South St. Vrain Creek Pipeline Pump Station Construction
Renovation
Post-Bid
Longmont, Lyons, CO 80540

29th Street Pump Station
Results
$2,000,000 to $3,000,000 est. value
Pueblo, CO

West Junction Metropolitan District Public Infrastructure
Infrastructure
Post-Bid
Grand Junction, CO

On-Call Storm Sewer Maintenance Cleaning Inspecting and Repairs
Term Contract
Results
Less than $40,000 est. value
Wheat Ridge, CO

Overlook Park Facilities Construction
Infrastructure, Alteration
Post-Bid
$11,722,030 est. value
Steamboat Springs, CO 80477

Last Updated 05/20/2022 04:40 PM
Project Title

The Bijou Subdivision Phase 1

Physical Address View project details and contacts
City, State (County) Bellvue, CO 80512   (Larimer County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Storm/Sewers
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes rough grading, installation of water distribution; sewer system including lift station, gravity mains, manholes and force-main; storm-water facilities including detention basins; an irrigation pond; and street sub-grade preparation for the development.

Details

Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents