Similar Projects
Roof and Mechanical Unit Replacement
Bidding
Folly Beach, SC 29439

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Repair Maintenance Facility Bldg 536
Post-Bid
$1,000,000 to $5,000,000 est. value
Charleston, SC 29404

HVAC Renovation for Bldg 174 Aerial Delivery Facility
Results
$250,000 to $500,000 est. value
Charleston, SC 29404

Back-up HVAC System for Server Room
Results
Charleston, SC 29415

Statewide Indefinite Delivery Contract for Mechanical / Plumbing Construction Services
Post-Bid

Boiler Repair
Results
Charleston, SC 29404

Convention Center Chiller Plant Equipment Replacement
Post-Bid
North Charleston, SC 29418

Storm Eye Institute Rooftop Exhaust Fans Replacement
Results
$200,000 to $250,000 est. value
Charleston, SC 29425

Preventative Maintenance for HVAC Equipment and Components
Term Contract
Post-Bid
Kiawah Island, SC 29455

Basic Science Building Rooftop Exhaust Fans Replacement
Results
$500,000 to $750,000 est. value
Charleston, SC 29425

J--Krauss Mri Chillers Servicing
Post-Bid
Charleston, SC 29401

Berry Residence Hall Replacement of 4 Air Cooled Chillers
Results
$309,000 to $391,000 est. value
Charleston, SC 29403

J--Krauss MRI Chillers (Brundage) / 534-19-3-2715-0256
Post-Bid
Charleston, SC 29401

Replace Refrigeration Condensers on TTC Palmer Campus
Results
Charleston, SC 29403

Last Updated 01/02/2019 12:43 PM
Project Title

Remove and Replace 50` of Galvanized Duct Work at the Psychiatry Hospital Auditorium

Physical Address View project details and contacts
City, State (County) Charleston, SC   (Charleston County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,800
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Remove and replace approximately 50' of galvanized duct work beneath the MUSC Institute of Psychiatry Hospital Auditorium located at 67 President Street. The platform shall consist as follows: 1. Remove damaged galvanize duct 2. Furnish and Install new duct with weather tight external insulation 3. All work is considered in confined space 4. Duct size 36"X 14"X 50'
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents