Similar Projects
Scheduled and Emergency Cleaning, Repair and Reconstruction of Drainage Structures and Pipes at Various Locations
Infrastructure
Bidding
$874,744 est. value

Drainage Pipe
Post-Bid
Royalston, MA

Round Pond Retaining Wall Partial Reconstruction
Post-Bid
Less than $340,000 est. value
Milford, MA

Route 31 Culvert Replacement
Results
$816,014 est. value
Princeton, MA 01541

Ware River Branch - MP 16.50 Slope Stabilization
Results
Less than $985,000 est. value
New Braintree, MA

Corrugated Polyethylene Pipe
Post-Bid
Leicester, MA

Scheduled and Emergency Drainage Repairs and Improvements at various Locations
Results
Less than $685,975 est. value

Stafford Street Culvert Replacement
Post-Bid
Less than $130,000 est. value
Charlton, MA 01507

Scheduled and Emergency Drainage System Repairs and Improvements at Various Locations
Results
Less than $2,176,397 est. value

Granite Curbing Install for Fiscal Year 2021
Term Contract
Post-Bid
Less than $190,000 est. value
Westborough, MA

Scheduled and Emergency Drainage Structure Reconstruction and Repairs at Various Locations
Results
Less than $637,000 est. value

Round Pond Retaining Wall Reconstruction
Post-Bid
Less than $550,000 est. value
Millbury, MA

Drainage and Paving Project
Results
Less than $400,000 est. value
Harvard, MA 01451

Drilling IDIQ In Massachusetts and Rhode Island
Post-Bid

Precast Concrete Box Culvert
Results
Less than $416,000 est. value
Bolton, MA 01740

Last Updated 07/08/2021 08:04 AM
Project Title

Planning to Replace the Culvert

Physical Address View project details and contacts
City, State (County) Grafton, MA 01519   (Worcester County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $536,790
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Planning to replace the culvert (Bridge No. G-08-048) ±Stowe Road over Miscoe Brook.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents