Similar Projects
Last Updated | 12/28/2020 02:06 PM |
Project Title | Zone 2 and 3 Pump Station and Pipeline Project |
Physical Address | View project details and contacts |
City, State (County) | Herriman, UT 84096 (Salt Lake County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency - 11/09/20 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work for the Zone 2 and 3 Pump Station and Pipeline Project includes the following elements: • Construction of a new concrete pump house building, including equipping with both Zone 2 and Zone 3 booster pump facilities, VFDs, mechanical piping, onsite sodium hypochlorite generator, surge protections, and appurtenances for a complete and functional installation, located adjacent to the City’s existing Zone 1 Tank (near 15300 South 3700 West, west of the Mountain View Corridor). • Construction of yard piping improvements, and connections to transmission piping. • Excavation to construct the new building within the limits of the site; backfill and grading; construction of access road and site improvements. • Installation of Owner-supplied emergency generator. • Construction of electrical systems, instrumentation and controls for the pump station. • Site fencing and landscaping. • Pump station startup and commissioning. • Transmission pipeline construction, commissioning and surface restoration. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |