Similar Projects
Mole Lake Wastewater Treatment Facility Fine Screen Replacement Project
Infrastructure
Bidding
$793,276 CJ est. value
Mole Lake, WI 54520

2023 Dye Water Flooding Project
Infrastructure
Bidding
$70,000 CJ est. value
Shorewood, WI 53211

Boiler Bottom Blowdown Valve Replacement
Renovation
Sub-Bidding
$109,000 CJ est. value
Allouez, WI 54301

Clarity Endcap Buildout
Renovation, Alteration
Post-Bid
Verona, WI 53593

Private Property Inflow And Infiltration Reduction - Residential Plumbing Contractors
Term Contract
Post-Bid
Milwaukee, WI

Northwest Restroom Facility MEP
Renovation, Alteration - 3,500 SF
Results
$2,336,300 est. value
West Allis, WI 53214

2022 Sanitary Sewer Lining Mayer Street Area
Infrastructure
Results
$402,130 CJ est. value
Neenah, WI 54956

2022 Lead Service Line Replacement
Infrastructure
Construction
$581,013 CJ est. value
Hartford, WI 53027

Steam and Condensate Repairs
Renovation
Construction
$169,500 CJ est. value
Waupun, WI 53963

Kewaskum School Cooler Expansion
Infrastructure, Alteration
Post-Bid
$100,000 est. value
Kewaskum, WI 53040

Welding Lab MEP Relocations for Equipment Connections
Alteration
Results
$200,000 est. value
Appleton, WI 54914

Exterior Envelope Repair - Lathrop Hall and Van Vleck Hall
Renovation
Construction
$5,290,000 CJ est. value
Madison, WI 53706

Pumping of Grease Traps and Catch Basins
Alteration
Post-Bid
River Falls, WI

PSTC Propane Piping Replacement
Alteration
Results
$700,000 est. value
Appleton, WI 54914

Liquid Waste Pumping and Inspection Services
Alteration
Post-Bid
Madison, WI

Last Updated 06/20/2023 06:31 PM
Project Title

River Point Fill

Physical Address View project details and contacts
City, State (County) Manitowoc, WI 54220   (Manitowoc County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $202,965 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Fill South of River Point and fill and compaction on the triangle lot shall be substantially completed on or before August 15th, 2023. Project shall be substantially completed on or before November 01, 2023. A Bid Bond or Surety 2000 in the amount of 5% of the bid must accompany each proposal as a guaranty. Supplies for completing all work included in this contract. This Contract consists of loading and importing fill from 333 Avenue and stockpiling or compacting in the Phase 2 Redevelopment Area at River Point. The construction work includes loading material, haul off, importing and compacting clean fill, and stockpiling clean fill. Also included are erosion control measures, installing a storm inlet, placing topsoil and seed, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract. The Contractor shall furnish all of the necessary labor, materials, equipment, and supplies for completing all work included in this contract. Fill South of River Point and fill and compaction on the triangle lot shall be substantially completed on or before August 15th, 2023. Project shall be substantially completed on or before November 01, 2023.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents