Similar Projects
Friendsville Elementary School Roof Replacement - Garrett County Public Schools
Infrastructure
Conception
$1,750,000 CJ est. value
Friendsville, MD 21531

Hickory Environmental Educational Center Roof - Garrett County Public Schools
Infrastructure
Conception
$250,000 CJ est. value
Accident, MD 21520

AutoZone #5894 / Oakland
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Mountain Lake Park, MD 21550

Bridge Replacement Steel Girder Bridge No. 1101000 on MD 42 (Friendsville Road) Over Buffalo Run
Demolition, New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Friendsville, MD 21531

Concrete Sidewalks Project Backbone Mountain Youth Center
Infrastructure
Bidding
$50,000 CJ est. value
Swanton, MD 21561

Furnish and Install Synthetic Turf at the Multipurpose Turf Field
Infrastructure
Post-Bid
$6,000,000 CJ est. value
McHenry, MD 21541

Southern High School Field House
New Construction, Infrastructure
Post-Bid
$44,000,000 CJ est. value
Oakland, MD 21550

MD 42 (Friendsville Road) Buffalo Run Structure 11010 to PA State Line Safety and Resurface Garrett County
Infrastructure
Results
$3,153,204 CJ est. value
Friendsville, MD 21531

Crack Sealing and Asphalt Mastic Repairs on Various Roadways in Allegany, Garrett, and Washington Counties - Areawide
Infrastructure
Results
$1,455,625 CJ est. value
Oldtown, MD 21555

Southern Garrett High School HVAC Installation - Garrett County Public Schools
Infrastructure
Conception
$4,500,000 CJ est. value
Oakland, MD 21550

Snowy Creek Bridge G-14 Concrete Abutments Construction
New Construction, Infrastructure
Post-Bid
$4,330,517 CJ est. value
Oakland, MD 21550

(SBR) Underground Tank Removal at Backbone Mountain Youth Center
Infrastructure
Results
$18,894 CJ est. value
Swanton, MD 21561

Yough Glades Elementary AC Installation - Garrett County Public Schools
Infrastructure
Conception
$2,000,000 CJ est. value
Oakland, MD 21550

Curb and Gutter Installation
Infrastructure
Post-Bid
$50,000 CJ est. value
Grantsville, MD 21536

I-68 WB 1.01 Miles West of MD 546 in Garrett County to 0.38 Miles East of Allegany County Line
Infrastructure
Results
$3,499,448 CJ est. value
Grantsville, MD 21536

Last Updated 08/14/2023 07:01 PM
Project Title

Concrete Sidewalks Project Backbone Mountain Youth Center

Physical Address View project details and contacts
City, State (County) Swanton, MD 21561   (Garrett County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Small Business Reserve - Invitation for Bids (IFB) for a contractor to install concrete sidewalks and additions to current sidewalks at various locations at the Department of Juvenile Services, Backbone Mountain Youth Center, 124 Camp 4 Road, Swanton, MD 21562. Bidders are strongly encouraged to attend to examine the work site and obtain answers or clarifications of the specifications and special requirements of working in a secure environment. If you have any questions pertaining to this project, please submit them in writing to the Robert P. Gay, Procurement Officer as soon as possible via email at Robert.gay@maryland.gov. Procurement Officer: Robert Gay Telephone Number: 410-979-2486 E-mail Address: Robert.gay@maryland.gov VSBE Participation Goal 0% A. This project consists of the Contractor providing all labor, equipment, materials, supplies, insurance, licenses and permits, etc. necessary to install concrete sidewalks and additions to current sidewalks at various locations at Backbone Mountain Youth Center. B. Work associated with the above listed project description includes but is not limited to the following: 1. The Contractor shall excavate and grade areas and fill with compacted material 4" thick. Frame and pour concrete 4" thick with 3,500 psi concrete with wire mesh reinforcement. Broom finish, expansion joints every 6'. Sidewalks to be flush with ground, backed up on edges with dirt then seed and mulch applied. All material used for forms to be removed and disposed of offsite once job is complete. 2. The Contractor shall supply all materials, supplies, and labor to have installation done properly. 3. All work will need done to Garrett County Code C. Areas to be Extended; 1. Front of School; 52ft Long x 3ft. Wide 2. Nurse Sidewalk 10ft Long X 2 ft. Wide 3. Basketball court 12ft Long X 3 ft. Wide D. Areas for New Concrete: 1. 2 sidewalks at Generator Building, both 6 Ft. wide, 1 is 29 ft. long, other is 23 feet. 2. Back of Administration Building. 17ft long X 7 ft. wide 3. Dorm Pathway 48 ft. long X 6 wide 4. Kitchen Furnace Room 32 ft. long X 6 ft. wide 5. New Incentive Building: 2 sidewalks, The Front sidewalk is 83 feet long X 6 ft. wide, The Back sidewalk is 40 Feet long X 6 ft. wide. E. Areas that needs old sidewalks removed and replaced with new sidewalk 1. GYM needs a 10 ft. X 10 ft. poured by the door, then 50ft. Long X 6 ft. Wide sidewalk 2. Case Managers 42 ft. Long X 4 ft. Wide. 3. Dorm Furnace 38 ft. Long X 5 ft. Wide 4. Back of Dayrooms 18 ft. Long X 12 ft. Wide

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents