Similar Projects
Facility New Construction, Additions and Renovations - 2020 Bond - Platteville Public Schools
Addition, New Construction, Infrastructure, Renovation
Conception
$36,000,000 CJ est. value
Platteville, WI 53818

Facility New Construction, Additions and Renovations - 2020 Bond - Platteville Public Schools
Addition, New Construction, Infrastructure, Renovation
Conception
$36,000,000 CJ est. value
Platteville, WI 53818

Cuba City School District 2022 Bond - Elementary and High School
Addition, Demolition, Renovation, Infrastructure
Design
$36,000,000 CJ est. value
Cuba City, WI 53807

Dickeyville - Lancaster Const / Passing Lanes and Slopes / Misc
Infrastructure
Design
$7,000,000 CJ est. value
Lancaster, WI 53813

Snowplowing Bids
Infrastructure
Post-Bid
Muscoda, WI

Snow Plowing Bids
Infrastructure
Post-Bid
Muscoda, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Gravel, Single Chip Seal Coating and Crack Filling
Results
Bloomington, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Scenic Rivers Energy Cooperative Headquarters Building
New Construction, Infrastructure - 56,000 SF
Pending Verification
$7,000,000 CJ est. value
Lancaster, WI 53813

Scenic Rivers Energy Cooperative Headquarters Building
New Construction, Infrastructure - 56,000 SF
Pending Verification
$7,000,000 CJ est. value
Lancaster, WI 53813

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Highway Painting
Results
Platteville, WI

Red Barn Wind Farm
Infrastructure
Construction
$162,000,000 CJ est. value
Wingville, WI 53569

Last Updated 01/19/2023 06:43 AM
Project Title

Hazel Green - Platteville, N. Limit Cuba City to Bus. 151

Physical Address View project details and contacts
City, State (County) Livingston, WI 53554   (Grant County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $7,456,483 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Grant County; 5235-03-70, WISC 2023 140; STH 80; 8.557 Miles; Excavation, Base, Concrete Pavement, HMA Pavement, Asphaltic Surface, Curb and Gutter, Sidewalk, Signs, Beam Guard, Pavement Marking, Structure Repairs, Structure Painting, Street Lighting, Storm Sewer, and Culverts Estimate Anticipated Funding $6,000,000 - $6,999,999 With each sealed proposal, the bidder must include a properly executed bid bond or a cashier's check, certified check, bank's check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. The bidder may also satisfy the proposal guaranty requirements by having a properly executed annual bid bond on file with the Department. Contractors should submit all questions concerning plans and/or proposals through Website. This process is documented and can be found at Website. WisDOT - 06- Hazel Green - Platteville, N. Limit Cuba City to Bus. 151 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents