Similar Projects
Pueblo Cannabis
Renovation, Infrastructure - 3,400 SF
Design
$150,000 est. value
Coachella, CA 92236

Cannabis 21+ Dispensary / Anza
Renovation, Infrastructure - 3,966 SF
Design
$200,000 est. value
Anza, CA 92539

D Street Concrete Paver Repair and Sidewalk Improvements
Infrastructure
Bidding
$600,000 CJ est. value
Perris, CA 92570

Fire Station 84 Renovation
Addition, Demolition, Renovation, Infrastructure - 748 SF
Bidding
$1,208,145 CJ est. value
Temecula, CA 92592

ADA Improvement Project 31540-42 Railroad Canyon Road
Alteration
Post-Bid
Canyon Lake, CA 92587

San Jacinto Street Pavement and Sidewalk Improvements
Infrastructure
Post-Bid
$850,000 est. value
San Jacinto, CA 92583

2020/2021 SB-1 Street Maintenance Improvements
Infrastructure
Results
$5,147,829 est. value
Riverside, CA 92519

Parking Lot Seal and Stripe Services
Infrastructure
Results
$30,000 est. value
Indio, CA 92202

Diamond Valley Partners Mixed Use Development
New Construction, Infrastructure - 87,812 SF
Pending Verification
$11,000,000 CJ est. value
Winchester, CA 92596

Rehab Pavement, Install FO/ VDS/ Upgrade ADA Ramps
Infrastructure
Design
$32,217,000 CJ est. value
Hemet, CA 92545

Norco MDP Line N-5 Storm Drain Project
Infrastructure
Bidding
$1,500,000 CJ est. value
Norco, CA 92860

High Visibility Crosswalk Improvements
Infrastructure
Post-Bid
Palm Desert, CA 92260

Wayne Makin Park Slurry Seal Project
Renovation, Infrastructure
Results
$55,000 to $60,000 est. value
Norco, CA 92860

Washington Street at Avenue 50 and Calle Tampico Sidewalk and Ada Improvements
Infrastructure
Bidding
$120,000 CJ est. value
La Quinta, CA 92253

Pacific Avenue Pedestrian and Bicycle Improvement
Infrastructure
Post-Bid
$325,000 est. value
Jurupa Valley, CA 92509

Last Updated 08/01/2022 04:12 AM
Project Title

Improvement of Bike Network Connectivity/ATP Trails

Physical Address View project details and contacts
City, State (County) Corona, CA 92880   (Riverside County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Design Development, Construction Start Expected August 2022,
Bids Due View project details and contacts
Estimated Value $7,220,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design and construction of nearly 5 miles of trails running along Scholar Way and Harrison Avenue, utilizing excess right-ofway rather than impacting vehicle circulation/travel lanes. The project will provide dedicated space for people to bike and walk from northern City limit to the Santa Ana River trail connecting to schools, parks, retail and neighborhoods. The contractor for construction will be selected by a bidding procedure. Measure A will be used for the required local match. As of June 22, 2022, information regarding a general contractor is not available. A timeline for construction has not been determined. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents