Similar Projects
Flood Protection - City of San Jose
Infrastructure
Conception
$7,986,000 est. value
San Jose, CA 95134

Measure T - New Fire Station 36 - City of San Jose
New Construction, Infrastructure
Conception
$11,985,000 est. value
San Jose, CA

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Costco - Westgate West / San Jose
Demolition, New Construction, Infrastructure - 166,058 SF
Design
$46,000,000 CJ est. value
San Jose, CA 95129

De Anza Park Pathway Renovation
Infrastructure
Post-Bid
$546,000 est. value
Sunnyvale, CA 94087

South Loop Project
Infrastructure
Post-Bid
Santa Clara, CA 95134

SCWP - Site Preparation Project
Infrastructure
Results
Sunnyvale, CA

Removal and Replacement of Concrete within the Public Right-Of-Way
Infrastructure
Results
San Jose, CA

Forest Hill Elementary School Phase One
New Construction
Construction
$4,500,000 est. value
San Jose, CA 95130

Eterna Tower
New Construction, Infrastructure - 1,500 SF
Pending Verification
$37,000,000 CJ est. value
San Jose, CA 95113

Hemlock Avenue Mixed Use Development
New Construction, Infrastructure - 11,910 SF
Pending Verification
$24,000,000 CJ est. value
San Jose, CA 95128

Tully Road Ballfields Dog Park Improvements - City of San Jose
Renovation, Infrastructure
Conception
$500,000 est. value
San Jose, CA 95121

Main Street Milpitas
New Construction, Infrastructure - 350,257 SF
Design
$16,300,000 CJ est. value
Milpitas, CA 95035

Reconstruction of Curbs Gutters and Sidewalks
Infrastructure
Post-Bid
$1,150,000 est. value
Cupertino, CA

Lawrence Expressway Pavement Rehabilitation Project Between US-101 and SR-237
Infrastructure
Results
Santa Clara, CA 95056

Last Updated 09/23/2022 02:38 AM
Project Title

FHL Sidewalk Repairs, Jolon

Physical Address View project details and contacts
City, State (County) Palo Alto, CA 94306   (Santa Clara County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $741,859 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Solicitation W911SA22B2010 FHL Sidewalk Repairs, Jolon, CA 93928 To Whom It May Concern, Reference Request for Quote for the following MATOC Solicitation, W911SA22B2010, at Fort Hunter Liggett, CA. Award has been made to C&C Contracting, Inc., for a total of $741,859.00. Thank you for your interest in this project. If you have any questions, please contact Vance C. Bickford at 608-388-1007, or via email at vance.c.bickford.civ@mail.mil. The Mission and Installation Contracting Command (MICC), Fort McCoy, Wisconsin has a requirement for FHL sidewalk repairs, Jolon, CA 93928 on Fort Hunter Liggett, CA. Work to be performed will be within the North American Industry Classification System (NAICS) with a Code 238110 small business size standard of $16.5 million. Solicitation W911SA22B2010 will be issued as an Invitation for Bids (IFB) using the procedures outlined in Federal Acquisition Regulation (FAR) Part 14 as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), and the Army Federal Acquisition Regulation Supplement (AFARS). It is anticipated that this requirement will be awarded as a single award, firm fixed-price contract. This solicitation will be Full and Open Competition Project magnitude is between $500,000 and $1,000,000. Period of Performance: Work is to be completed NLT 3 June 2023, anticipated award Jul 2022. MICC Fort McCoy intends to issue the solicitation within 30 days of this presolicitation notice. The site visit date and time will be provided in the solicitation, once it is posted. Electronic copies of each bid shall be compatible with the following software products: Adobe Acrobat Reader 11 and Microsoft Office Suite 2016. Narrative portions of the proposal shall be in Adobe Acrobat portable document file (pdf) searchable text format. The Offeror shall not embed sound or video (e.g., MPEG) files into the proposal files. Electronic files shall be clearly identified for each Bid, section, and item. Do not contact the Contract Specialist for requests to change the set aside or to state your interest. Parties interested in the solicitation, associated documents, and solicitation amendments can add themselves to the Interested Vendors List; contractors will not be directly notified of postings of any related documents. All questions, concerns, verification or clarification of information regarding this solicitation, scope and any documents included in the solicitation package shall be submitted in writing to vance.c.bickford.civ@army.mil no later than 10:00 AM, PDT on Friday, 21 Jun 2022. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents