Similar Projects
RFP D/B - Corridor Improvements on Route 79 and Davol Street
Infrastructure
Bidding
$108,719,546 est. value
Fall River, MA

On-Call Sidewalk Construction
Infrastructure
Bidding
$2,000,000 est. value
Taunton, MA

Replacement of Asphalt Parking Lot at Chandler Avenue Development Located in Taunton
Infrastructure
Post-Bid
$30,000 est. value
Taunton, MA

Supply and Deliver of Granite Curbing for FY22
Term Contract, Infrastructure
Post-Bid
Mansfield, MA

Sidewalk Reconstruction Along Thacher and Snell Streets, Oakhurst 667-1
Results
$40,000 est. value
Attleboro, MA 02703

Westlawn Courtyard Design Phase 2
Results
Less than $140,000 est. value
New Bedford, MA 02741

Repair of Roadway Trenches and Concrete Sidewalks
Infrastructure
Bidding
$150,000 est. value
Fall River, MA

2021 CDA Barrett Street Contract
Term Contract
Post-Bid
$180,000 est. value
Fall River, MA 02724

Fairhaven Visitors Center Entry Door Restoration
Results
Less than $113,000 est. value
Fairhaven, MA 02719

Sidewalk Construction
Infrastructure
Bidding
$6,005,700 est. value
Taunton, MA

Pickleball Court and Parking Lot Upgrade
Renovation, Infrastructure
Post-Bid
Easton, MA 02356

Parking Lot Rehab - Ma
Results
North Attleborough, MA

North Street Parking Lot Repaving
Infrastructure
Post-Bid
$64,000 est. value
New Bedford, MA 02740

Replace Handicapped Accessible Ramp at the Town Hall Annex
Results
Less than $30,000 est. value
Swansea, MA 02777

Brickenwood Courtyard Upgrades Phase III
Infrastructure
Post-Bid
$100,000 est. value
New Bedford, MA

Last Updated 05/31/2022 11:18 PM
Project Title

Parking Lot Reconstruction, Anthony Haven

Physical Address View project details and contacts
City, State (County) Fairhaven, MA 02719   (Bristol County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $323,400 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The removal and replacement of bituminous asphalt parking areas, curbing, asphalt and concrete sidewalks, accessible ramps, dumpster enclosure, site lighting and other associated site improvements.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents