Similar Projects
Public Safety Building - PUBSF 24-01 - City of Waukee
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Waukee, IA 50263

Public Safety Building - PUBSF 24-01 - City of Waukee
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Waukee, IA 50263

10th Street & Sunrise Dr Phs II A Improvements
Infrastructure
Design
$13,300,000 CJ est. value
Waukee, IA 50263

10th Street & Sunrise Dr Phs II A Improvements
Infrastructure
Design
$13,300,000 CJ est. value
Waukee, IA 50263

East Street Stabilization Project
Infrastructure
Post-Bid
$120,000 est. value
Van Meter, IA 50261

New Concessions Building - General Construction , Mechanical and Electrical
New Construction, Renovation, Infrastructure
Post-Bid
$800,000 CJ est. value
Van Meter, IA 50261

Walnut Street Streetscape Phase 1
Infrastructure, Alteration
Results
$56,060 est. value
Dallas Center, IA 50063

Eagle Vista Drive Pavement Rehabilitation
Infrastructure
Results
$148,770 est. value
Adel, IA 50003

Dupaco Community Credit Union / Waukee
New Construction, Infrastructure - 6,400 SF
Pending Verification
$1,500,000 CJ est. value
Waukee, IA 50263

Fourth Street Park Building - City Of Waukee
New Construction, Infrastructure - 2,373 SF
Pending Verification
$18,736,000 CJ est. value
Waukee, IA 50263

Monroe Court Water Main: 70th to 72nd - WA08-01 - City of Urbandale
Infrastructure
Conception
$344,500 CJ est. value
Urbandale, IA 50323

RFQ Design - Satellite Maintenance Facility at 170th Street and Waterford Road
New Construction, Infrastructure
Post-Bid
$250,000 CJ est. value
Waukee, IA 50263

PCC Patching
Infrastructure
Results

Middle Level 6 - 2020 Bond - Waukee Community School District
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Waukee, IA 50263

Monroe Court Water Main: 72nd to Roseland - WA18-01 - City of Urbandale
Infrastructure
Conception
$424,000 CJ est. value
Urbandale, IA 50323

Last Updated 06/27/2023 02:03 PM
Project Title

T Avenue Corridor Improvements

Physical Address View project details and contacts
City, State (County) Waukee, IA 50263   (Dallas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construct the T Avenue Corridor Improvements including all materials, labor and equipment necessary for installation of approximately: 190,000 CY of Grading, 47,000 SY of Subgrade Preparation, 400 TONS of Cement Treated Subgrade, 5,400 CY of 6" Modified Subbase, 10,500 SY of 9" PCC Pavement, 1,500 SY of 8" Temporary PCC or HMA Pavement, 6,100 Tons of HMA Pavement HT, 2,800 SY of PCC Shared Use Path, 500 SY of 4" or 6" PCC Sidewalk, 4,700 Tons of Granular Surfacing, 9,200 LF of Water Main, 6,800 LF of Sanitary Sewer, 7,200 LF of Storm Sewer, 72 EA of Intakes or Manholes, one Reinforced Box Culvert, traffic signalization, 10,300 LF of 2" Conduit, 19,000 LF of Fiber Optic Cable, 360 STA of pavement marking, signing, erosion control, surface restoration, and miscellaneous related work and appurtenances. Each bidder shall accompany its bids with bid security as defined in Iowa Code Section 26.8, as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in a form acceptable to the City for the faithful performance of the contract and guaranteeing payment to all persons supplying labor and/or materials in the execution of the work provided for in the contract, in an amount equal to 100% of the amount of the contract. Additionally the bidder must provide the City with a guarantee of maintenance of said improvement for a period of four (4) years from the time of acceptance by the City. The bidder's security shall be in an amount equal to ten percent (10%) of the total amount of the bid and shall be in the form of a cashier's check or a certified check drawn on an FDIC insured bank in Iowa or on an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a bid bond on the form provided in the contract documents with corporate surety satisfactory to the City. The bid shall contain no condition except as provided in the specifications. All earthwork for the Public Safety Site needs to be within 1" of the grading details provided on sheets U101 - U104 and the 8" rock pad placed on the building footprint by December 1, 2023. This date is referred to as the Intermediate Completion Date. Final Project Completion shall occur on or before September 30, 2024. The duration of the work is critical to the project so as to minimize damage to other streets and public infrastructure and the disruption associated with the project to the public. Damages in the amount of Seven Hundred Fifty Dollars ($750.00) per calendar day Questions regarding meeting format may also be directed to the City Clerk's office at 515-978-7904. Please contact the City Clerk's office at 978-7904 or bschuett@waukee.org if you have questions or electronic accessibility issues. The City reserves the right to reject any and/or all bids and to waive any and/or all technicalities and/or all irregularities.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents