Last Updated 10/18/2021 10:36 AM
Project Title

West Downtown Water Main Replacement

Physical Address View project details and contacts
City, State (County) El Mirage, AZ   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $484,044
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project work will consist of the installation of approximately 1,400 linear feet of 6-inch C900 DR18 CL235 PVC water main, installation of 39 new 1” Municipex water service lines, installation of 2 new fire hydrants, water valves, fittings, removal and replacement of street pavement sections, and construction of other related appurtenances and items of work along 2nd, 3rd, and 4th Avenues between Ventura Street and the alley approximately 470-feet south of Ventura Street. Additional work includes, but is not limited to, the removal and replacement of curb and sidewalk, abandonment of existing water lines after the new water main has been placed in service, traffic control, mobilization and site restoration. There is also an Alternate Bid which includes only improvements along 2nd Avenue and 3rd Avenue between Ventura Street and the alley approximately 470-feet south of Ventura Street.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents