Similar Projects
Summerville ES Bus Loop and vehicular Parking Lot
Post-Bid
$600,000 to $750,000 est. value
Summerville, SC 29483

Contract 1 - Water Distribution Line Replacements and Upgrades
Infrastructure
Post-Bid
Saint George, SC

Water Box and Lid for W and S Department - Annual Pricing
Term Contract
Results
Summerville, SC 29483

Road Resurfacing and Paving Project
Results
Saint George, SC

Repairs Existing Retention/Detention Ponds
Infrastructure
Post-Bid
SC

Preservation - District 6
Results

On-Call Sidewalk Repair-District 6
Term Contract, Infrastructure
Post-Bid

Concrete Paving At Upper Wastewater Treatment Plant
Results
Saint George, SC 29477

Water Box and Lid
Term Contract
Post-Bid
SC

TOS Regional Stormwater Pond
Results
Summerville, SC 29483

Full Depth Patch-District 6
Infrastructure
Post-Bid

Paving Oakridge Drive
Results
Summerville, SC 29483

Crack Seal-District 6
Infrastructure
Post-Bid

North Hickory Street Sidewalk Installation
Infrastructure
Results
Summerville, SC 29483

Rosenwald School Civil Project
Infrastructure
Post-Bid
Saint George, SC 29477

Last Updated 06/20/2022 04:10 AM
Project Title

Access Road - Phase 2

Physical Address View project details and contacts
City, State (County) Ridgeville, SC   (Dorchester County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Paving/Reconstruction, Sanitary Sewers, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves the extension of the campus on-site two-lane access road. The work includes, but is not limited to, clearing and grubbing, erosion and sediment control, soil stabilization, earthwork, grading, curb and gutter, paving, pavement markings, signage, and installation of a stormwater drainage system with curb inlets, concrete piping, and stormwater ponds with control structures. A three-span, 120-foot-long, pile supported bridge is required where the access road crosses Timothy Creek. A 12 watermain and an empty conduit ductbank for future street lighting will be required along the road. The work also includes the installation of a new pump station with a force main that connects to Dorchester County's sewer system. The contractor will also be required to construct a temporary haul road and a 2 temporary waterline.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents