Similar Projects
Temporary Bypass Road Contract
Post-Bid
Less than $126,000 est. value
Hobart, WI 54155

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Manitowoc - Green Bay, SCl - NCl
Results
Green Bay, Manitowoc, WI 54220

Crackfilling
Post-Bid
De Pere, WI

2021 Street and Utility Improvements Bohemia Drive, Hager Road, and Schleis Lane
Results
Denmark, WI 54208

Green Isle Park Paving
Post-Bid
$300,000 est. value
Allouez, WI 54301

2021 Resurfacing
Results
Green Bay, WI

2021 Road Construction
Post-Bid
De Pere, WI

V. Bellevue, Manitowoc Road, Allouez Avenue - Kewaunee Road
Results
WI

Local Road Improvement
Post-Bid
WI

TIF 2 Riverside Drive
Results
Less than $500,000 est. value
Suamico, WI 54173

2021 Road Improvement
Post-Bid
WI

Sewer and Water Relay and Street Resurfacing
Results
De Pere, WI

Culvert replacement and Hot Oil Chip Sealing
Post-Bid
WI

Last Updated 11/12/2021 11:20 PM
Project Title

Hilbert - Green Bay, South County Line - Duester Street

Physical Address View project details and contacts
City, State (County) WI   (Brown County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

6.818 Miles; Grading, Base, Milling, Asphalt Pavement, Culvert Pipes, Curb and Gutter, Sidewalk, Guardrail, Pavement Markings, and Box Culvert Extension. Excavation Common, 2,345 CY; Borrow, 1,523 CY; Backfill Structure, 162 Ton; Base Aggregate Dense, 18,839 Ton; Breaker Run, 14 Ton; Concrete Masonry Culverts, 21 CY; Bar Steel Reinforcement, 1,510 Lbs; Bar Steel Reinforcement Coated, 1,480 Lbs; Marking Epoxy, 96,930 LF; Construction Staking, 48,093 LF; Construction Staking, 4 Each; Construction Staking, 2 LS; Culvert Pipe, 16 LF 12”, 92 LF 18“, 4 LF 24“, 12 LF 36“, 78 LF 48“; Concrete Curb and Gutter, 313 LF; Concrete Sidewalk, 196 SF; Beam Guard, 2,264 LF; Beam Guard Energy Absorbing Terminals, 12 Each; Asphaltic Surface, 1,712 Ton; HMA Pavement, 26,309 Ton; Removing Asphaltic Surface Milling, 127,222 SY; Tack Coat, 13,743 Gals; Signs, 8 SF; Foundation Backfill, 237 CY.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents