Similar Projects
Last Updated | 11/12/2021 11:20 PM |
Project Title | Hilbert - Green Bay, South County Line - Duester Street |
Physical Address | View project details and contacts |
City, State (County) | WI (Brown County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 6.818 Miles; Grading, Base, Milling, Asphalt Pavement, Culvert Pipes, Curb and Gutter, Sidewalk, Guardrail, Pavement Markings, and Box Culvert Extension. Excavation Common, 2,345 CY; Borrow, 1,523 CY; Backfill Structure, 162 Ton; Base Aggregate Dense, 18,839 Ton; Breaker Run, 14 Ton; Concrete Masonry Culverts, 21 CY; Bar Steel Reinforcement, 1,510 Lbs; Bar Steel Reinforcement Coated, 1,480 Lbs; Marking Epoxy, 96,930 LF; Construction Staking, 48,093 LF; Construction Staking, 4 Each; Construction Staking, 2 LS; Culvert Pipe, 16 LF 12”, 92 LF 18“, 4 LF 24“, 12 LF 36“, 78 LF 48“; Concrete Curb and Gutter, 313 LF; Concrete Sidewalk, 196 SF; Beam Guard, 2,264 LF; Beam Guard Energy Absorbing Terminals, 12 Each; Asphaltic Surface, 1,712 Ton; HMA Pavement, 26,309 Ton; Removing Asphaltic Surface Milling, 127,222 SY; Tack Coat, 13,743 Gals; Signs, 8 SF; Foundation Backfill, 237 CY. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |