Similar Projects
Secondary Building Roof and Awning Repair and Replacement
Bidding
Dove Creek, CO

Deck and Stair Repairs
Post-Bid
Snowmass Village, CO 81615

Historic Courthouse Stone Masonry
Post-Bid
Walsenburg, CO

Lone Tree Golf Clubhouse Exterior
Results
$150,000 to $200,000 est. value
Lone Tree, CO

Bear Park Phase III - Climate Battery and Dome Functionality
Results
Glenwood Springs, CO 81601

Exterior Restoration and Rehabilitation
Construction
Saguache, CO 81149

Re-Plaster and Re-Tile The Bob Burger Recreation Center Lap Pool
Post-Bid
Lafayette, CO

Remediate Campus Fall Hazards, Phase 1 and Phase 2
Results
$800,000 est. value
Golden, CO 80401

Julesburg Rest Area EIFS Repair and Window Replacement
Post-Bid
Less than $160,000 est. value
Julesburg, CO 80737

Cu Den Bldg 1St Replace Main Doors
Results
Denver, CO

Rabbit Ears Pass Siding
Post-Bid
Less than $75,000 est. value
CO

Exterior Stair Replacement - Timberline PK-8
Results
Longmont, CO 80504

Buffalo Run Golf Course Club House Stair Railing Replacement
Post-Bid
Commerce City, CO

Nottingham Park Pavilion Water Proofing Repair Project
Results
Avon, CO 81620

Woodman Hall Exterior Egress Stair Replacement Project
Post-Bid
Fountain, CO 80817

Last Updated 03/16/2021 01:46 PM
Project Title

Stucco Rehabilitation at the Recreation Center

Physical Address View project details and contacts
City, State (County) Longmont, CO 80501   (Boulder County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Repair and fill all Flicker holes. Repairs should include the following: a. Remove all debris from hole b. Install proper backing material c. Seal all holes 2. Apply a true stucco overlay that is impervious to woodpeckers. Overlay shall: a. Closely match existing facility colors. b. Overlay should provide at a minimum a 5 year warranty that prohibits penetration from all birds and other wildlife. 3. Provide the price for applying the application from top of the windows to ground level in the following sections: a. Back side of building (east) there are at least 12 holes. The City will need to trim some of the trees for access. b. Inside gate area where waterslides exit out of building (east wall) c. Backside of gym area to climbing wall (west side of building) d. Lower half of the silo with add alt of entire silo. e. Playground area from back door of babysitting room (north wall above back door of babysitting room) f. South side of the building (by tennis court parking lot) g. Entire upper back area accessed by roof. Both lower and upper sections.

Details

Division 09 - Finishes, Cement Plastering, Cement Stucco.
Division 10 - Specialties, Exterior Protection.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents