Similar Projects
CIP Valve Replacement
Post-Bid
Palm Bay, FL

Prequalification of Companies to Bid Construction Services for the Pineda Causeway Water Transmission Mains Project
Post-Bid
Melbourne, FL 32901

Brevard County Utility Services Department Underground Utility Contractor Services Fiscal Year (FY) 2020
Term Contract
Results
Viera, FL 32940

Brevard County Utility Services Department Underground Utility Contractor Services Fiscal Year (FY) 2020
Term Contract
Results
Viera, FL 32940

Septic Tank, Grease Trap, Lift Station and Sewage Hauling Services County Wide
Term Contract
Post-Bid
Viera, FL 32940

Greenboro Forcemain Replacement Project
Results
$649,000 est. value
West Melbourne, FL 32904

Gate Valves
Post-Bid
Palm Bay, FL

259 and 263 North Courtenay Parkway 4" Sewer Lateral Repair
Results
Merritt Island, FL 32953

Desilt and Video
Results
Less than $175,000 est. value
FL

Columbia Lane - Brandywine Lane Water Main Project
Results
$1,200,000 est. value
West Melbourne, FL 32904

Thurm Boulevard Force Main Replacement
Results
Cape Canaveral, FL 32920

Sherwood Park Water Quality Enhancements
Results
$1,667,834 est. value
Melbourne, FL 32901

Sykes Creek Zone North Force Main Extension
Results
$372,265 to $721,607 est. value
Viera, FL 32940

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Subaqueous Crossings Pipeline Repair Services - FEMA
Term Contract
Results
Melbourne, FL 32901

Last Updated 07/29/2020 08:27 AM
Project Title

North Courtenay Parkway Force Main and Reuse Extension, Phase 3

Physical Address View project details and contacts
City, State (County) Merritt Island, FL 32953   (Brevard County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,219,042
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the installation and construction of approximately 5,700 LF of 6” PVC forcemain, together with 5,700 LF of 12” PVC Reclaimed water line, along the west side of the North Courtenay Parkway right-of-way (FDOT right-of-way). Most installation will be accomplished via standard excavation; however some locations require Direct Bore installation with up-sized HDPE pipe. The work includes utility installation, excavation, dewatering, backfill and right-of-way restoration in conformance with the project permits and the Contract Documents.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents