Similar Projects
2023 Third Street Reconstruction Project and Tk Access Road Project
Infrastructure
Bidding
$1,000,000 CJ est. value
Middleville, MI 49333

2023 Third Street Reconstruction Project and Tk Access Road Project
Infrastructure
Bidding
$1,000,000 CJ est. value
Middleville, MI 49333

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pit Cleaning-Bascule Bridges, Multiple Services
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

0.76 MI of Hot Mix Asphalt Cold Milling and Resurfacing, Concrete Curb and Ramps, Adjust Drainage Structure Cover and Pavement Markings on Michigan Avenue from State Road to Woodlawn Avenue
Infrastructure
Results
Hastings, MI

2022 Whippoorwill/Greenwood Street Sanitary Sewer and Water Main Improvements and Village-Wide Sanitary Sewer CIPP Project
Infrastructure
Construction
$787,414 CJ est. value
Middleville, MI 49333

2023 Wellhouse Improvements
Renovation, Infrastructure
Bidding
$116,000 CJ est. value
Freeport, MI 49325

2022 Riverside Park Improvements
New Construction, Infrastructure
Post-Bid
$300,000 CJ est. value
Nashville, MI 49073

Asphalt Paving
Infrastructure
Results
MI

2023 Shared Use Pathway Extensions
Infrastructure
Bidding
$2,000,000 CJ est. value
Thornapple Township, MI 49333

2023 Proposed Parking Lot 8 Reconstruction
Infrastructure
Post-Bid
$400,000 CJ est. value
Hastings, MI 49058

2022 Crack Seal Blocks
Infrastructure
Results
MI

TK Middle School Serving Line Renovation
Infrastructure
Post-Bid
Middleville, MI 49333

Pavement Repairs on M-37 and M-43 - MDOT Barry County
Infrastructure
Results
$600,000 est. value
Hastings, MI 49058

Last Updated 04/28/2023 07:32 PM
Project Title

2023 LDFA Enterprise Drive Improvements

Physical Address View project details and contacts
City, State (County) Hastings, MI 49058   (Barry County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Any questions regarding the RFP must be submitted before Wednesday, May 09, 2023 at 5:00 p.m. If necessary, an addendum to the RFP will be provided to all holders of the RFP of record.No proposal or bid may be withdrawn for a period of sixty (60) days after the opening of the proposals or bids except as provided in the RFP.The City of Hastings is soliciting bids for its 2023 LDFA Enterprise Drive Improvements. Project completion date will be Friday, June 30th, 2023 An offeror requesting clarification or interpretation of this RFP should contact Travis J. Tate, P.E. Director of Public Services at (269) 945-2468 or ttate@hastingsmi.org .

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents