Similar Projects
Bay View Park Improvements
New Construction
Conception
$900,000 est. value
Alpena, MI 49707

Impact Attenuating Surfacing for Playground Structures
Term Contract
Bidding
Livonia, MI

Mackinac Island Historic State Park Milliken Nature Center at Arch Rock Plaza
New Construction, Renovation
Bidding
Beverly Hills, MI

Gun Lake Park Improvement Services
Post-Bid
Wayland, MI

Sigsbee Park/Buchanan Elementary Playground Improvements
Post-Bid
Grand Rapids, MI 49503

Town Square Park Project
Results
Livonia, MI

Playground Soft Surface Material
Results
Utica, MI

Park Promenade Development
New Construction - 165,000 SF
Construction
$10,000,000 CJ est. value
Woodhaven, MI 48183

City Line Apartments
New Construction
Construction
Kentwood, MI 49548

Rapids View Development
New Construction, Infrastructure
Bidding
$490,000 est. value
Huron Township, MI

Athletics Upper Fields Track Pavilion
Post-Bid
Rochester, MI 48309

Playground Upgrades
Results
Oak Park, MI 48237

Blissfield Mini Park
New Construction
Bidding
Blissfield, MI

Park Drinking Fountains
Post-Bid
Taylor, MI

Preservation Park Pavilion Design and Build Project
Results
Less than $250,000 est. value
Canton, MI

Last Updated 12/28/2021 08:45 AM
Project Title

Grove Holman Park Warming Center Renovation

Physical Address View project details and contacts
City, State (County) Owosso, MI 48867   (Shiawassee County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Major items include: Work includes but is not limited to: selective demolition, masonry restoration, stucco restoration, steel lintel replacement, steel remediation, rough carpentry, finish carpentry, metal roofing, membrane roofing, EIFS patch and repair, doors, windows, storefront and glazing, window restoration, gypsum board, ceramic tile, painting, signage, awnings, lighting and power

Details

Park/Playground, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents